Communication Check
After installation, wiring, and configuration are completed, check the communication status by connecting
the TCP/IP cable and run the MODBUS program to see whether the System BMS shows the data of the Rack
BMS correctly.
3.10.13.1
PC’s IP Setting for Communication with the System BMS
NOTICE
The following guide for PC’s IP setting is made with Microsoft
®
Windows
®
7. Other versions of
Windows may be different.
1.
Checking the Data of the System BMS requires changing the IP settings in the notebook PC to be used.
2.
Click the “START” button in the desktop’s status bar (①) to open the Start menu.
3.
Click “Network” (②). If “Network” menu is not available, click “Control Panel”
Figure 3-153: Open “Network”
4.
When the Network window appears, click “Network and Sharing Center” (③).
Содержание 136S
Страница 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Страница 4: ...Confidential English 8 2019 Rev 0 0 ...
Страница 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Страница 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Страница 149: ...Confidential 3 Installing the Product English 8 2019 Rev 0 0 131 Figure 3 164 Cell Information ...
Страница 153: ...Confidential Memo ...
Страница 154: ...Confidential Memo ...
Страница 155: ...Confidential Memo ...
Страница 156: ...www SamsungSDI com ...