3
.
Installing the Product
Confidential
98
English 8/2019. Rev 0.0
3.10.8
SMPS Assembly and SMU Signal Cable Connection
The following steps are only for an SMPS Assembly Type A.
1.
Connect the signal cable from the SMPS Assembly to SMU “WIRE ASSY RACK TO SYSTEM.”
Figure 3-112: CAN Signal Cable Connection from SMPS Assembly 3 Phase Type A to SMU
2.
Connect the MODBUS TCP/IP Cable
4
to the SMPS Assembly Type A.
Figure 3-113: TCP/IP Cable Connection to SMPS Assembly
3.
Connect the Dry Contact Cable to SMPS Assembly Type A
4
Not factory-provided. Must be provided by the installer or customer.
Содержание 136S
Страница 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Страница 4: ...Confidential English 8 2019 Rev 0 0 ...
Страница 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Страница 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Страница 149: ...Confidential 3 Installing the Product English 8 2019 Rev 0 0 131 Figure 3 164 Cell Information ...
Страница 153: ...Confidential Memo ...
Страница 154: ...Confidential Memo ...
Страница 155: ...Confidential Memo ...
Страница 156: ...www SamsungSDI com ...