
EB 8111/8112 EN
6-1
Start-up
6 Start-up
The work described in this section is only to
be performed by personnel qualified for the
assignment accordingly.
Risk of burn injuries due to hot or cold com-
ponents and pipeline.
Valve components and the pipeline may be-
come very hot or cold. Risk of burn injuries.
Î
Allow components and pipelines to cool
down or heat up.
Î
Wear protective clothing and safety
gloves.
Risk of hearing loss or deafness due to loud
noise.
Noise emission (e.g. cavitation or flashing)
may occur during operation caused by the
process medium and the operating
conditions. Additionally, a brief loud noise
may occur through the sudden venting of the
pneumatic actuator (see 'Fail-safe position')
or pneumatic valve accessories not fitted with
noise-reducing fittings. Both can damage
hearing.
Î
Wear hearing protection when working
near the valve.
Crush hazard arising from actuator and
plug stem moving.
Î
Do not insert hands or finger into the
yoke while the valve is in operation.
Î
Before working on the control valve,
disconnect and lock the pneumatic air
supply as well as the control signal.
Î
Disconnect the supply voltage before
performing any work on the control
valve.
Î
Do not impede the movement of the actu-
ator and plug stem by inserting objects
into the yoke.
Î
Before unblocking the actuator and plug
stem after they have become blocked
(e.g. due to seizing up after remaining in
the same position for a long time),
release any stored energy in the actuator
(e.g. spring compression). See
associated actuator documentation.
Risk of personal injury due to exhaust air
being vented from pneumatically operated
components.
While the valve is operating, the actuator or
valve accessories may vent during closed-
loop control or when the valve opens or
closes.
Î
Wear eye protection when working in
close proximity to the control valve.
Before start-up or putting the valve back into
service, make sure the following conditions
are met:
−
The valve is properly installed into the
pipeline (see the 'Installation' section).
−
The leak and function tests have been
completed successfully (see the 'Testing
the installed valve' section).
WARNING
!
WARNING
!
WARNING
!
WARNING
!
WARNING
!
WARNING
!
Содержание EB 8111 EN
Страница 12: ...1 8 EB 8111 8112 EN...
Страница 36: ...7 2 EB 8111 8112 EN...
Страница 49: ...EB 8111 8112 EN 9 11 Servicing...
Страница 50: ...9 12 EB 8111 8112 EN...
Страница 56: ...12 2 EB 8111 8112 EN...
Страница 58: ...13 2 EB 8111 8112 EN...
Страница 64: ...14 6 EB 8111 8112 EN...
Страница 66: ...15 2 EB 8111 8112 EN Annex 5 1 4 13 17 97 14 98 15 8 11 12 16 63 62 96 5 96 Type 3321 DN 15 to 50 NPS to 2...
Страница 67: ...EB 8111 8112 EN 15 3 Annex 15 11 12 16 2 5 1 4 13 17 14 63 62 5 2 8 Type 3321 DN 65 to 100 NPS 2 to 4...
Страница 69: ......
Страница 70: ......
Страница 71: ......