
5-8
EB 8111/8112 EN
Installation
To test the valve functioning before start-up
or putting back the valve into operation, per-
form the following tests:
5.4.1 Leak test
The plant operator is responsible for per-
forming the leak test and selecting the test
method. The leak test must comply with the
requirements of the national and internation-
al standards that apply at the site of installa-
tion.
Our after-sales service can support you to
plan and perform a leak test for your plant.
1.
Close the valve.
2. Slowly apply the test medium to the inlet
space upstream of the valve. A sudden
surge in pressure and resulting high ve-
locities can damage the valve.
3. Open the valve.
4. Apply the required test pressure.
5.
Check the valve for leakage to the atmo
-
sphere.
6.
Depressurize the pipeline section and
valve.
7. Rework any parts that leak and repeat
the leak test.
5.4.2 Travel motion
The movement of the actuator stem must be
linear and smooth.
Î
Apply the maximum and minimum con-
trol signals to check the end positions of
the valve while observing the movement
of the actuator stem.
Î
Check the travel reading at the travel in
-
dicator scale.
5.4.3 Fail-safe position
Î
Shut off the signal pressure line.
Î
Check whether the valve moves to the
fail-safe position (see the 'Design and
principle of operation' section).
5.4.4 Pressure test
The plant operator is responsible for per-
forming the pressure test.
Our after-sales service can support you to
plan and perform a pressure test for your
plant.
During the pressure test, make sure the fol-
lowing conditions are met:
−
Retract the plug stem to open the valve.
−
Observe the maximum permissible pres-
sure for both the valve and plant.
Tip
Tip
Содержание EB 8111 EN
Страница 12: ...1 8 EB 8111 8112 EN...
Страница 36: ...7 2 EB 8111 8112 EN...
Страница 49: ...EB 8111 8112 EN 9 11 Servicing...
Страница 50: ...9 12 EB 8111 8112 EN...
Страница 56: ...12 2 EB 8111 8112 EN...
Страница 58: ...13 2 EB 8111 8112 EN...
Страница 64: ...14 6 EB 8111 8112 EN...
Страница 66: ...15 2 EB 8111 8112 EN Annex 5 1 4 13 17 97 14 98 15 8 11 12 16 63 62 96 5 96 Type 3321 DN 15 to 50 NPS to 2...
Страница 67: ...EB 8111 8112 EN 15 3 Annex 15 11 12 16 2 5 1 4 13 17 14 63 62 5 2 8 Type 3321 DN 65 to 100 NPS 2 to 4...
Страница 69: ......
Страница 70: ......
Страница 71: ......