5-12
EB 8075 EN
Installation
5.3.3 Installing the valve into
the pipeline
Risk of valve damage due to work being
carried out by personnel not qualified for
such tasks.
The plant operator or specialist company
performing the welding is responsible for the
selection of the welding procedure and the
actual welding operations on the valve. This
also applies to any required heat treatment
to be performed on the valve.
Î
Only allow qualified welding personnel
to carry out welding operations.
Premature wear and leakage due to insuffi
-
cient support or suspension.
Î
Support or suspend the valve sufficiently
at suitable points.
NOTICE
!
NOTICE
!
Alignment to 0
60 Yoke
82 Screw
84 Travel indicator scale
180.2 Anti-rotation fixture
0
84
82
180.2
60
Fig. 5-6:
Aligning the travel indicator scale
Содержание EB 8075 EN
Страница 28: ...3 14 EB 8075 EN...
Страница 34: ...4 6 EB 8075 EN Shipment and on site transport...
Страница 58: ...8 4 EB 8075 EN...
Страница 60: ...9 2 EB 8075 EN...
Страница 66: ...12 2 EB 8075 EN...
Страница 68: ...13 2 EB 8075 EN...
Страница 70: ...14 2 EB 8075 EN...
Страница 77: ......
Страница 78: ......
Страница 79: ......