EB 2551-2 EN
5-3
Installation
5.2
Preparation for installation
Before installation, make sure the following
conditions are met:
−
The valve is clean.
−
The valve, actuator and all piping are
not damaged.
−
Install a strainer upstream of the regula-
tor.
−
The valve data on the nameplate (type
designation, valve size, material, pres
-
sure rating and temperature range)
match the plant conditions (size and
pressure rating of the pipeline, medium
temperature etc.). See the 'Markings on
the device' section for nameplate details.
− The requested or required additional fit
-
tings have been installed or prepared as
necessary before installing the valve (see
the 'Design and principle of operation'
section).
Proceed as follows:
Î
Lay out the necessary material and tools
to have them ready during installation
work.
Î
Flush the pipeline
before
installing the
regulator.
The plant operator is responsible for
cleaning the pipelines in the plant.
Î
Check any mounted pressure gauges to
make sure they function properly.
Table 5-1:
Inlet and outlet lengths
DN
min.
a x DN
min.
b x DN
a
Inlet length
b
Outlet length
State of process
medium
Valve conditions
Inlet length a
Outlet length b
Gas
Ma ≤ 0.3
2
4
Liquid
Free of cavitation/w < 3
m
/
s
2
4
Cavitation producing noise/w ≤ 3
m
/
s
2
4
Содержание 33-7
Страница 12: ...1 8 EB 2551 2 EN ...
Страница 14: ...2 2 EB 2551 2 EN ...
Страница 21: ...EB 2551 2 EN 3 7 Design and principle of operation Dimensional drawings L H ØD H2 Fig 3 3 Dimensions ...
Страница 22: ...3 8 EB 2551 2 EN ...
Страница 34: ...5 8 EB 2551 2 EN ...
Страница 38: ...7 2 EB 2551 2 EN ...
Страница 48: ...11 2 EB 2551 2 EN ...
Страница 50: ...12 2 EB 2551 2 EN ...
Страница 52: ...13 2 EB 2551 2 EN ...
Страница 57: ......