4.1 Accepting the delivered
goods
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Check that
the specifications on the valve and actua
-
tor nameplate match the specifications in
the delivery note. For more details on the
nameplate (see section 2.1).
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
4.2 Removing the packaging
from the valve and actu
-
ator
Risk of regulator damage due to foreign par-
ticles entering the valve.
The protective caps fitted on the inlet and
outlet of the valve with flanged body prevent
foreign particles from entering the valve and
damaging it.
Do not remove the protective caps until im-
mediately before installation.
NOTICE
!
Do not remove the packaging until immedi-
ately before installation.
The components (valve and electric actuator)
of the regulator are delivered separately.
Proceed as follows to install the regulator:
Î
Do not open or remove the packaging
until immediately before lifting for instal-
lation into the pipeline.
Î
Leave the regulator components in its
transport container or on the pallet to
transport it on site.
Î
Do not remove the protective caps from
the inlet and outlet until immediately be-
fore installing the valve into the pipeline.
They prevent foreign particles from enter-
ing the valve.
Î
Dispose and recycle the packaging in ac-
cordance with the local regulations.
4.3 Transporting and lifting the
regulator
Due to the low service weight, lifting equip-
ment is not required to lift and transport the
regulator (e.g. to install it into the pipeline).
Transport instructions
Î
Protect the regulator against external in-
fluences (e.g. impact).
Note