![SAMES KREMLIN PPH 707 CHEM ICWB M TI Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/sames-kremlin/pph-707-chem-icwb-m-ti/pph-707-chem-icwb-m-ti_user-manual_3687715051.webp)
Index revision : A
51
7116
7.3. High voltage connection
(*) Level 1: Standard preventive maintenance
Level 2: Corrective maintenance
Level 3: Exceptional maintenance
Nota
: The cable is delivered prepared at its two ends according to the high voltage unit and to the
atomizer.
For the installation described in paragraph 1.4.1, it is necessary to cut the cable to the correct plate
according to the installation (adjustment of the distances between HVU / insulating table and HVU /
atomizer) and prepare the two ends so obtained according to the method described (
step 1) by adapting the stripped lengths so as to:
• ensure a mini distance of 250 mm mini between the shielding and any part with high voltage.
• ensure the ground connection of the shielding of the connecting cable HVU / insulating table at the
exit of the cage using the set (P/N # 910009044).
Note: For any length request higher than 13 m, contact Sames Technologies.
Item
Part Number
Description
Qty
Unit
of
sale
Maintenance
level
for spare part
(*)
910021895
High voltage connection
1
1
3
1
J2FENV445
O-ring - FEP viton
1
1
1
2
900014511
Ground plug
1
1
3
3
110000548
Banana plug
1
1
3
4
910022101
Resistance assembly
1
1
2
5
E4CSHT181
Cable terminal end
1
1
3
6
1411690
Sleeve, 100kV cable end
1
1
3
7
1411689
Split cone
1
1
3
8
1315058
Nut, grip holder
1
1
3
9
F6RXZG085
Stainless steel grip+seal
1
1
3
10
U1CBBR057
Protective tubing, HV cable,
13 m
m
1
11
E2DAVD101
100kV high voltage cable
13 m
m
1
910009044
Set of ground connection for cable
shielding
-
1
-
DES06460
1
2
3
4
5 6
7
8
9
10
11