background image

 

 

Salvus L1 lithium-ion 

cabinets manual

 

 

 

 

 

 

 

Version 2-2022 

 

 

Содержание L1-10

Страница 1: ...Salvus L1 lithium ion cabinets manual Version 2 2022 ...

Страница 2: ...ing the cabinet door 5 5 Storing and charging batteries 6 6 Earthing 6 7 Ventilation 6 8 Opening the cabinet after a fire 6 9 Explanation of the signals 7 10 Maintenance service and faults 8 Appendix 1 cabinet fittings 9 Models with eight charging points 9 Models with ten charging points 10 Appendix 2 wiring diagram 11 Appendix 3 Declaration of compliance 12 ...

Страница 3: ...p the manual and this additional information for reference For optimal performance and long term functionality and to ensure the safety and security of the cabinet we recommend regular maintenance If you have any questions about your Salvus lithium ion cabinet or in the unlikely event of a malfunction please get in touch with the Nauta Service Team Yours faithfully The Nauta Service Team ...

Страница 4: ...t and the ventilation grill by placing anything on top of the cabinet Place the cabinet in a well ventilated room In the event of a fire poisonous gases may be discharged Ensure that no unauthorised person who has not been instructed in the cabinet s use gains access to it A CEE form plug is attached to the lithium ion battery cabinet Ensure that the voltage of the electricity source corresponds w...

Страница 5: ...1 The fuse switch is inside the cabinet on the outside of the lowest technical compartment Ensure that the maximum power of the cabinet 3600W is never exceeded Ensure that the maximum load bearing capacity of the shelves of approx 60 kg is never exceeded Always keep the cabinet door closed so that any fire is limited to inside the cabinet Never impede the smoke duct and the ventilation grill by pl...

Страница 6: ...istant ventilation grill consists of a frame and slats and is filled with thermally expansive material If the temperature exceeds 100 C the grill closes and seals itself Ensure that the cabinet is in a well ventilated room Depending on its duration a fire may produce poisonous gasses The cabinet is installed with a mechanically ventilated smoke duct so that smoke and gasses that are produced by an...

Страница 7: ... of the signals Loud alarm door open Door open for more than 2 minutes Close the door Loud alarm emergency Call the emergency services Do not open the cabinet Calamity resolved Call Nauta Service Team 31 342 455 055 ...

Страница 8: ...e cost of the visit if you are not present at the agreed time or if the appointment is cancelled less than 24 hours in advance Netherlands Belgium Service staff member rate per hour 70 70 Standard call out charge 70 120 Before 5 pm urgent call out charge 110 160 After 5 pm urgent call out charge 170 220 Weekend urgent call out charge 225 275 Please note The minimum charge for a service staff membe...

Страница 9: ...Appendix 1 cabinet fittings Models with eight charging points 1 Ventilation 2 Shelf 3 Technical compartment 4 Lamp 5 Charging point 6 Automatic charging system 7 Alarm 8 Smoke alarm 9 CEE form plug ...

Страница 10: ...Models with ten charging points 1 Ventilation 2 Shelf 3 Technical compartment 4 Lamp 5 Charging point 6 Automatic charging system 7 Alarm 8 Smoke alarm 9 CEE form plug ...

Страница 11: ...Appendix 2 Wiring diagram ...

Страница 12: ...Appendix 3 Declaration of compliance ...

Отзывы: