background image

F

Installation guide

Guide d'installation

Guía de instalación

Eng

E

 N x B3 1x.. series
 N x B4 1x..

B3 - B4

NiBx151 Single Cylinder (Deadbolt functions 51 and 71)

1

2

3

6

Push!

click!

4

All contents current at time of publication. SALTO Systems S.L. reserves the right to change
availability of any item in this catalog, its design, construction, and/or materials.

AT THIS POINT DO NOT

CLOSE THE DOOR

PROGRAM THE CYLINDER FIRST

EN ESTE PUNTO NO CIERRE LA

PUERTA, PROGRAME PRIMERO EL

CILINDRO

Eng

E

NE FERMEZ PAS LA PORTE.

PROGRAMEZ LE CYLINDRE AVANT

F

      Installation

Installation            Instalación

Eng

F

E

SP225542

Not included/

Nicht enthalten/

Non inclus/

No incluido

Niet inbegrepen/

Non incluso/

Não incluso

i

225784-ED.- 24/06/2020

1/2

SALTO Neo Deadbolt

© 2020 SALTO Systems S.L.

1/2

5

Cylinder position

7

 NiB3141 Double Reader Cylinder (Function 41)

      Installation

Installation            Instalación

Eng

F

E

1

2

3

2.1

2.2

2.3

Cylinder position

Cut the spindle at the appropriate notch

POSITION

SP220412-N

+

-

-

+

                 Danger for electronic components

                 due to electrostatic discharge.

1.1

1.2

G1824

G1824

IP66

OUTDOOR Use!

INDOOR Use!

a

b

SALTO Recommended

Batteries SP01926-5

2-

1/

4"

 (

57)

1-1

/8"

 (29

)

B

   

O

1"

(

O

25,4)

O

2-1/8"

 (

O

54)

B

2-3/4"(70)

2-3/8"(60)

www.saltosystems.com/en/quick-links/manuals-and-guides/

i

Отзывы: