background image

D

Installation guide

Montageanleitung

Guide d'installation

Guía de instalación

Handleiding

Guida all'installazione

Guia de instalaçao

Eng

F

E

NL

I

P

PH2 (x1)

 N x E9 1x.. series
 N x E9 2x..
 N x E9 3x..

E9

1

2

3

5

Push!

+

-

-

+

click!

4

All contents current at time of publication. SALTO Systems S.L. reserves the right to change
availability of any item in this catalog, its design, construction, and/or materials.

AT THIS POINT DO NOT

CLOSE THE DOOR

PROGRAM THE CYLINDER FIRST

EN ESTE PUNTO NO CIERRE LA

PUERTA, PROGRAME PRIMERO EL

CILINDRO

Eng

E

TÜRE NICHT SCHLIESSEN.

ZUERST SCHLOSS PROGRAMMIEREN

NE FERMEZ PAS LA PORTE.

PROGRAMEZ LE CYLINDRE AVANT

D

F

SLUIT DE DEUR NOG NIET!

PROGRAMEER EN TEST DE CILINDER

OP EEN CORRECTE WERKIN

NL

PRIMA DI CHIUDERE LA PORTA,

PROGRAMARE IL CILINDRO

I

NESTE PONTO NÃO FECHE A PORTA,

PROGRAME O CILINDRO PRIMEIRO

P

      Installation     Montageanleitung

Installation     Instalación

     Handleidig

Montaggio      Instalação

Eng

D

F

E

I

P

NL

225789-ED.- 29/06/2020

1/2

           Danger for electronic components due to electrostatic discharge.

© 2020SALTO Systems S.L.

SALTO Neo Swinghandle

Cylinder

30

       

/ 35

(1-3/16" / 1-3/8")

33

O

17

10

11,6

E9

40°

6

      Battery change      Batterie tauchen      Remplacer les piles      Sustitución pilas       Batterijwissel      Sustituzione piles      Sustitução da pilhas

1

2

3

P

I

NL

E

F

D

Eng

DRY!

TROCKEN!

SEC!

SECO!

DROG!

ASCIUTTO!

1.1

1.2

G1824

G1824

IP66

OUTDOOR Use!

INDOOR Use!

a

b

SP225542

Not included/

Nicht enthalten/

Non inclus/

No incluido

Niet inbegrepen/

Non incluso/

Não incluso

+

PH2

i

SALTO

Recommended

Batteries SP01926-5

www.saltosystems.com/en/quick-links/manuals-and-guides/

i

Отзывы: