5.  INSTALLATION

5.1. 

RECEPTION OF GOODS

Each device is carefully checked before transportation. When receiving the goods, checking the devices for any damage made during transporta-

tion  is recommended. If any damage to the unit is observed, immediately contact the representatives of a transport company. Please inform the 

representative of the manufacturer, if any deviation of the device is noticed.

5.2. 

TRANSPORTATION AND STORAGE

• 

All units are factory-packaged to withstand normal conditions of transportation.

• 

When unpacking, check the unit for any damage made during transportation. Installing the damaged units is not allowed!

• The packaging is used for protection purposes only!

• When unloading and storing the units, use suitable lifting equipment to avoid damage and injuries. The storage place must be protected against 

dirt and water.

• The recommended storage period should not be longer than one year. 

5.3. 

UNPACKING

• Open the box. 

• Take out the unit of the box.

• 

After unpacking the unit, examine it to make sure that no damage was made during transportation. Installation of damaged units is not allowed!

• Before commencing the installation of the unit, please check if all ordered equipment has been delivered. Any deviation from the ordered equip-

ment list must be reported to the product supplier.

5.4. 

MOUNTING

Installing should only be performed by qualified and trained staff.

Coils are designed for mounting in horizontal position.

Water connection process should be processed using mounting scheme (see the scheme S1).

S1:

a - water flow in;

b - air flow;

c - water flow out.

When cooler is already mounted the draining system has to be connected. In order to do that siphon must be screwed to the cooler draining 

exhaust.

The draining system should be filled up with at least 0,5 l of water (siphon must be always filled with water).

Check if water reaches sewerage system.

When installed, the cooler should have an angle of 0-3° (fig. S2).

~100 mm

~100 mm

0 - 3

o

a

b

c

~100 mm

~100 mm

0 - 3

o

a

b

c

Figure 5.4.1.  S1 - AVA S

Figure 5.4.2.  S2 - AVA S

Содержание AVA S

Страница 1: ...AVA S AVA DX RWC RFC EN OPERATION INSTALLATION MAINTENANCE INSTRUCTIONS...

Страница 2: ...AND PRECAUTIONS 4 4 INFORMATION ABOUT THE PRODUCT 5 4 1 DESCRIPTION 5 4 2 DIMENSIONS AND WEIGHT 6 5 INSTALLATION 10 5 1 RECEPTION OF GOODS 10 5 2 TRANSPORTATION AND STORAGE 10 5 3 UNPACKING 10 5 4 MOU...

Страница 3: ...mation Apply the technical label on the unit in an easily accessible location or on the dashed location of the technical manual to keep the important information about the unit Figure 2 1 Technical la...

Страница 4: ...acturer Main safety rules Warnings Do not use the unit for purposes other than its intended use Do not disassemble or modify the unit in any way Never use this unit in any explosive or aggressive elem...

Страница 5: ...aluminium fins The casing is made of galvanized sheet steel Water type coolers use coolant cold water Freon type coolers use the R410A freon Easy to mount Suitable for operation indoor environment The...

Страница 6: ...AVA S AVA DX RFC RWC v2024 1 6 EN 4 2 DIMENSIONS AND WEIGHT Figure 4 2 1 AVA S 100 500 dimensions Figure 4 2 2 AVA S 600 710 dimensions Figure 4 2 3 AVA DX dimensions...

Страница 7: ...58 131 48 111 58 81 70 C4 mm 64 53 123 88 72 90 166 C5 mm 91 104 70 52 58 130 156 227 D1 mm 166 200 243 283 364 455 542 691 G1 mm 135 135 202 235 229 368 435 468 W1 mm 331 407 487 567 728 909 1 085 1...

Страница 8: ...0 C4 700x300 C2 700x300 C4 750x300 C2 750x300 C4 750x350 C2 750x350 C4 L mm 430 450 W mm 674 874 924 944 H mm 340 390 440 D mm 500 700 750 G mm 250 300 350 dn mm 16 F mm 70 C1 mm 44 48 44 48 44 48 C2...

Страница 9: ...F4 L mm 430 450 W mm 674 874 924 944 H mm 339 390 440 D mm 500 700 750 G mm 250 300 350 dn mm 16 F mm 70 C1 mm 45 52 49 40 C2 mm 240 290 278 334 303 C3 mm 54 60 54 46 C4 mm 612 815 866 876 863 C5 mm 6...

Страница 10: ...an one year 5 3 UNPACKING Open the box Take out the unit of the box After unpacking the unit examine it to make sure that no damage was made during transportation Installation of damaged units is not...

Страница 11: ...AVA S AVA DX RFC RWC v2024 1 EN 11 Figure 5 4 3 S1 AVA DX Figure 5 4 4 S2 AVA DX a b c 100 mm 100 mm 0 3 o a b c 100 mm 100 mm 0 3 o Figure 5 4 5 S1 RWC RFC Figure 5 4 6 S2 RWC RFC...

Страница 12: ...e is no mechanical damage on the casing 2 There is no coolant leak 3 The system has proper pressure it is especially important for freon type coolers 4 There is no air in the system of the water coole...

Страница 13: ...re Equipment Directive 2014 68 EU The following harmonized standards are applied in applicable parts LST EN ISO 12100 2011 Safety of machinery General principles for design Risk assessment and risk re...

Страница 14: ...fuse provision of free warranty servicing in cases when the warranty conditions listed below are disregarded 8 1 LIMITED WARRANTY COUPON 1 All equipment manufactured in our factory is checked in opera...

Страница 15: ...15 AVA S AVA DX RFC RWC v2024 1...

Страница 16: ...HER LANGUAGES DE FR IT LT RU https select salda lt file ava s ava dx rfx rwc de https select salda lt file ava s ava dx rfx rwc fr https select salda lt file ava s ava dx rfx rwc it https select salda...

Отзывы: