![Salda AMBERAIR Скачать руководство пользователя страница 36](http://html2.mh-extra.com/html/salda/amberair/amberair_installation-operation-and-maintenance-manual_4961335036.webp)
36
| EN
EIOM v2018.04
13. UNIT’S BASE FRAME GROUNDING
Fully assembled unit‘s base frame must be grounded:
• Between base frames (Example: General grounding diagram – D);
• Base of the fully assembled unit must be connected with the building grounding system (Example: General grounding diagram – F);
Figure 13.1 – Example of unit’s base frame grounding diagram