background image

 

                                                                                                                                                                                                                                                                                                                                                                             

  HS2/AS2 Series 

35 

36 

 

Remove the screw of grounding terminal and secure the additional grounding cable by insert a screw into the 

screw hole in the OT/DT terminal. Connect the grounding cables as the following diagram.   
Note: A 4 mm

2

 conductor cross-sectional area of cable is recommended for additional grounding cable. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 5.2 
Connecting the additional   
grounding cable 

 

 

 
 
 
 
 

5.2 AC Grid Wire and Backup Output Connection 
 

Conductor cross-sectional area of cables

mm

²)

 

Conductor material 

Scope 

Recommended value 

Copper 

2.5~6.0 

4.0 

Table 5.1   
Recommended AC cable specification 

Note: If  the grid-connection distance  is  too  far,  please  select an  AC  cable with  larger diameter as  per  the 
actual condition. 

 

Power cable connection procedure: 

Step 1&2: Plug in the assembly and disassembly tool to separate the locking nut and cable gland body 

Step 3: Pull the assembly and disassembly tool out 
Step 4: Unlock the sealing nut 

Step 5: Strip the insulation off the wires with 13mm length 
Step 6: Thread the cable through the cable gland and secure the wires with spanner 

Step 7: Connect the cable to the inverter 
Step 8: (Only applicable to market in Australia) During off grid operation time, PE line at the BACK-UP end will 

remain to be connected with the PE line at the power grid end inside the inverter. 

 

 
 
 
 
 
 
 
 
 
 
Figure 5.3 
Assembling the AC/backup connector   

 
 
 
 

Battery 4  

Battery 3  

Battery 2 

Battery 1 

Additional 
grounding cable

Содержание HS2 Series

Страница 1: ...ww saj electric com Add SAJ Innovation Park No 9 Lizhishan Road Science City Guangzhou High tech Zone Guangdong P R China GUANGZHOU SANJING ELECTRIC CO LTD HS2 AS2 Series THREE PHASE ALL IN ONE ENERGY...

Страница 2: ...ce trouble shooting and safety Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service Customer orientation is our forever co...

Страница 3: ...2 2 Mounting Method 21 4 3 Mounting Procedure 22 4 3 1 Installation Tools 22 4 3 2 Mounting Procedure 23 5 ELECTRICAL CONNECTION 33 5 1 Additional Grounding Cable 34 5 2 Connecting Battery COMM Cable...

Страница 4: ...s 62 6 5 2 Working Modes Instruction 62 6 6 Export Limit Setting 63 6 6 1 APP Setting 64 6 7 Self test For Italy 64 6 8 Setting Reactive Power Control For Australia 67 6 8 1 Setup Fixed Power Factor M...

Страница 5: ...not avoided will result in death or serious injury WARNING WARNING indicates a hazardous situation which if not avoided can result in death or serious injury or moderate injury CAUTION CAUTION indicat...

Страница 6: ...completely discharged after disconnecting from power source Please keep the power off prior to any operations Do not expose the battery to temperatures in excess of 50 C Do not subject the battery to...

Страница 7: ...ficient ventilation Do not use the battery if it is defective damaged or broken Only use the battery with compatible inverter Do not use the battery with other type of battery Make sure the battery is...

Страница 8: ...atteries 2 Do not damage the battery again shock fall trample etc 3 Keep damaged batteries away from water except to prevent an energy storage system from catching fire 4 Do not expose the damaged bat...

Страница 9: ...nagement system BMS which is used to ensure efficiency of the battery and protect the battery from operating outside its specified limitations 3 2 Specification for Product Model HS2 AS2 XK T2 T B HS2...

Страница 10: ...isplay 6 Communication Port 7 4G Wi Fi Module Port Communication Port 8 BAT BAT port for parallel connection 9 Start button 10 BACK UP 11 Grid Ground 12 Ground 13 Link Port 0 to battery module Positio...

Страница 11: ...9 2 No of MPPT 2 Battery Parameters Battery Type LiFePO4 Battery Voltage Range V 180 600 Max Charging Discharging Current A 30 30 Scalability BU2 5 0 HV1 5 up to 5 battery modules Short Time Withstand...

Страница 12: ...tion Ambient Humidity 0 100 Non condensing Altitude 4000m 3000m Power Derating Noise dBA 30 Model HS2 5K T2 AS2 5K T HS2 6K T2 AS2 6K T HS2 8K T2 AS2 8K T HS2 10K T2 AS2 10K T HS2 10K T2 B AS2 10K T B...

Страница 13: ...e and if such evidence is present do not open the package and contact your dealer as soon as possible 4 1 2 Scope of Delivery Please contact after sales if there are missing or damaged components Inve...

Страница 14: ...d by natural convention and suggested an indoor installation or an installation under a sheltered place to prevent the product from exposure to direct sunlight rain and snow erosion Figure 4 1 Install...

Страница 15: ...or living arears including but not limited to the following areas bedroom lounge living room study toilet bathroom theater and attic When installing the device at the garage please keep it away from d...

Страница 16: ...ep 2 Place the base on the ground make sure the edge of base is 28 34mm away from wall Place the battery module on the base and secure it with screws M4 10 Figure 4 5 Securing the battery Step 3 Stack...

Страница 17: ...mplate Remove the rubber feet for the top battery module before installing inverter Figure 4 8 Drilling holes to install inverter Step 6 Use a rubber hammer to drive the screw fixing seat into the hol...

Страница 18: ...battery system Step 1 Assemble the bracket and secure it with screws Figure 4 10 Assembling the bracket Step 2 Mark the proper positions of mounting bracket and drill holes on those positions 14mm in...

Страница 19: ...f rubber feet on bracket and use a screw M4 10 to secure it with locking brackets Figure 4 12 Install the locking bracket Step 4 Install the locking brackets inverter with screws M6 12 onto the invert...

Страница 20: ...Remove the rubber feet for the top battery module before installing inverter Figure 4 14 Drilling holes for installation of Inverter Step 6 Use a rubber hammer to drive the screw fixing seat into the...

Страница 21: ...protective equipment must be employed by technicians including insulating gloves insulating shoes and safety helmet WARNING Connect this additional grounding cable before other electrical connection N...

Страница 22: ...distance is too far please select an AC cable with larger diameter as per the actual condition Power cable connection procedure Step 1 2 Plug in the assembly and disassembly tool to separate the locki...

Страница 23: ...be disconnected from grid quickly The inverter does not require an external residual current device as it has integrated with a RCMU If local regulations require the application of external residual c...

Страница 24: ...for connection of cables Please connect the positive connector to the positive side of the solar panels and connect the negative connector to the negative side of the solar side Be sure to connect th...

Страница 25: ...this crimped end is for battery side connection The other end is for inverter side connection Customer should crimp the other end of communication cable by themselves 2 Confirm that the DC switch is O...

Страница 26: ...in the communication module to 4G WIFI port and secure the module by rotating the nut 1 4G Wi Fi port could be externally connected with eSolar 4G module eSolar Wi Fi module or eSolar AIO3 module for...

Страница 27: ...tage battery systems must be operated by qualified technicians in accordance with local and national power grid standards and regulations Step 1 Connect the power cable from B port of inverter to B po...

Страница 28: ...al cable of AC and backup side must be connected together for the safety reason Note DO NOT connect the PE terminal of BACKUP side The system connection for grid system without special requirements is...

Страница 29: ...AC and backup side must be connected together for the safety reason Note DO NOT connect the PE terminal of BACKUP side The system connection for grid system without special requirements is as below N...

Страница 30: ...ith screws M4 25 Figure 5 16 Installing side covers for battery module 5 10 AFCI Optional The inverter is equipped with arc fault circuit interrupter AFCI With AFCI protection when there is an arc sig...

Страница 31: ...1 Turn on the circuit breaker Step 2 Press and hold the main switch for 2 3s until the display is on 6 1 2 Shut Down Step 1 Press and hold the main switch for 5s until the display is off Step 2 Turn...

Страница 32: ...porting and exporting at all Off Off grid Battery Solid Battery is discharging On 1s off 1s Battery is charging On 1s off 3s SOC low Off Battery is disconnected or inactive Grid Solid Connected to gri...

Страница 33: ...e the LED indicators on the inverter to ensure the inverter is running properly 6 4 eSAJ APP Connection 6 4 1 Account Login Step 1 Log in to eSAJ Home if you do not have an account please register fir...

Страница 34: ...Local Connection Step 3 Enter password 123456 Step 4 Click on Bluetooth and activate the Bluetooth function on your phone then click on Next Step 5 Choose your inverter according to your inverter SN...

Страница 35: ...ent electricity generated by photovoltaic system will be supplied to load first the surplus energy will be stored in battery then the excess electricity will be exported to the grid When the solar is...

Страница 36: ...each other Method 1 Export limitation setting is to control the export electricity to the grid Method 2 Generation limit is to control the electricity generated by the inverter 6 7 Self test For Italy...

Страница 37: ...Quick Installation Manual Step 2 Select Italy for Country and choose your corresponding Grid Code from Initial Setting Step 3 You can choose self test item required Individual self test time is approx...

Страница 38: ...lect Power Adjustment and enter password 201561 Step 2 Select Capacitive Power Factor or Inductive Power Factor according to your local grid regulation The power factor range is from 0 8 leading 0 8 l...

Страница 39: ...ion please select corresponding grid compliance according to state regulation during installation You can choose a state regulation compliance with your local grid via eSAJ Home 2 Log in to eSAJ Home...

Страница 40: ...temperature as 20 C 40 C humidity 85 RH 3 For long term storage 3 months please put it in an environment with a temperature of 25 C to 25 C and a humidity of 85 RH 4 The battery should be stored in a...

Страница 41: ...Voltage High 66 Slave Phase3 Voltage Low 67 Slave Frequency High 68 Slave Frequency Low 73 Slave No Grid Error 74 PVInputModeFault Code Fault Information 1 Master Relay Error 2 Master EEPROM Error 3 M...

Страница 42: ...al Communication Error 98 Battery Module Sequence Error 99 Discharge Overcurrent Protection 100 Charge Overcurrent Protection 101 Module Under Voltage Protection 102 Module Over Voltage Protection 103...

Отзывы: