- 61 -
1) Turn ON the DC switch at the right side of the B1 No.3> B1
No.2>B1 No.1> AS1;
2) Turn on the battery switch at the right side of the B1 No.3> B1
No.2>B1 No.1> AS1;
3) Wait for 30s and observe the LCD and LED indicators on the front
of AS1 to check the running status of the.
4) If the system is running normal, please do commission
configuration. If the system is not work normally, please re-check
your wiring and setting until the system runs normal.
Notice: If the AS1 is connected with B1 device(s), the start-up
procedure for the system should be B1 No. 3>> B1 No. 2>> B1 No.1>>
AS1 (refer to figure 3.12).
5.4 System Commissioning
Please refer to eSolar 4G/Wi-Fi Module Quick Installation Guide for
details.
5.4.1 Install Commission Tool
Installers shall install the commission App (eSolar SET) to the smart
phone for commission configuration.
>>For iOS system, please search “eSolar SET” in App Store to
download and install this APP.
>>For Android system, please search “eSolar SET” in Google play to
Содержание AS1-3KS-5.1
Страница 1: ...1...
Страница 4: ...3 WARRANTY CARD 78...
Страница 32: ...31 Fig 3 14 Hang B1 AS1 together to the mounting brackets...
Страница 50: ...49 Fig 4 13 CT installation...
Страница 72: ...71 agents as it may damage the components...
Страница 76: ...75 Curve for a Volt Watt response mode AS4777 Series Curve for a Volt Var control mode AS4777 Series...
Страница 82: ...81...