Maintenance
2022/04
Operating instructions Concept PDG 2906 peristaltic dosing pump
40 / 44
Continue turning the rotor clockwise until the
pump tube is free.
Remove the tube kit.
Caution, splash hazard
Cover tube holder with a cloth.
Pull the pump tube away from the connection.
Clean pump housing.
Rotate the rotor into angled “D” position.
Place new tube in position to the left of the
rotor.
Slide the tube holder into the guide on the left
(
).
Continue turning the rotor clockwise.
While turning the rotor, press the pump tube
into the guide.
Slide the tube holder fully into both guides.
Check that the tube holder sits flush.
Rotate the rotor several times to align the
pump tube.