91
Unless stated otherwise all dimensions are in mm
Safescreen
6.3 Main Fame assembly
6.3.1 Internal Main Channels
Start the SAFESCREEN
®
frame assembly by fixing bolts. Stiffeners, Lifting Barrels and
Main Bobbins to the internal Main Channel.
At this stage do not fix bolts for braces or platforms.
Lifting Barrel Main Support
Bobbin
MF Spacer
Lifting Barrel
M16 Bolts
Stiffening Angle
Main Channel
M16 Washer & M16
Nylok Nut
Main Support
Bobbin
MF Spacer Tube
WARNING
Warning!
Once paired Main Channels are joined together DO NOT reposition or turn over the
beam until a frame is fully assembled.
WARNING
Warning!
For the correct use of the S
tiffening
Angles (Product code: 595102) see page 40.
Содержание Hunnebeck Safescreen
Страница 1: ...Perimeter climbing screen system SAFESCREEN User guide...
Страница 10: ...10 Unless stated otherwise all dimensions are in mm Overview 2 Overview...
Страница 154: ...154 Unless stated otherwise all dimensions are in mm Notes...
Страница 155: ...155 Unless stated otherwise all dimensions are in mm Safescreen...