Unless stated otherwise all dimensions are in mm
Safescreen
8 Installation and Operation
8.1 Pre-installation
Pre-installationchecklist
q
- Ensure SAFESCREEN® unit has been assembled as per the scheme assembly
drawings.
q
- Check the Lifting Barrels have been installed in the correct positions.
q
- Check the lacing tube has been fixed correctly to the Main Channel using Half
Coupler (if specified).
q
- Ensure the slab is of sufficient concrete strength to bear the loading of the units as
per the scheme design drawings.
q
- Ensure the lifting straps are of sufficient length and provide a minimum of 60° to
the horizontal.
q
- Ensure the lifting pathway is clear for unit lift.
q
- Ensure the straps and crane capacity is sufficient.
q
- Ensure Support Shoes have been correctly positioned and secured to the slab.
Содержание Hunnebeck Safescreen
Страница 1: ...Perimeter climbing screen system SAFESCREEN User guide...
Страница 10: ...10 Unless stated otherwise all dimensions are in mm Overview 2 Overview...
Страница 154: ...154 Unless stated otherwise all dimensions are in mm Notes...
Страница 155: ...155 Unless stated otherwise all dimensions are in mm Safescreen...