105
Unless stated otherwise, all dimensions are given in mm.
MANTO®
Step 1
Loosen the locking screw of the MANTO G3 Front Tie Nut and release it completely
from the panel profile.
Step 2
Release the wing nut on the MANTO G3 Front Tie Nut.
Step 3
Unscrew the Tie Rod from the MANTO G3 Counter Nut (approx. 60 mm).
Step 4
Pull the MR Tie Rod and the MANTO G Front Tie Nut out of the formwork. The Tie
Sleeve remains in the concrete. The Sealing Cones can be carefully removed after
stripping and used again later.
9.3 One-sided tying with the PLATINUM 100 tie system
There are two versions of the PLATINUM 100 tie rod available, Generation 1 (G1) and
Generation 2 (G2). The Tie Rod G2 has been modified and the adjusting washer for
adjusting the wall thickness has been replaced by the hinged adjustment clip. This facil-
itates the adjustment of the wall thickness.
When formwork is not stacked (extended), tying can be done from the closing side in
most cases. When using stacked formwork, it is advisable to install the platforms on the
advancing side of the formwork and to tie from there.
The operator always has to decide on site which side offers the safest position for
operating the ties.
Tie rod G1
Tie rod G2
Содержание Huennebeck MANTO G3
Страница 1: ...MANTO Large frame panel formwork User guide...
Страница 9: ...9 Unless stated otherwise all dimensions are given in mm MANTO...
Страница 61: ...61 Unless stated otherwise all dimensions are given in mm MANTO MANTO G3 M MANTO G3 M...
Страница 219: ...219 Unless stated otherwise all dimensions are given in mm MANTO...