5
Continue adding additional sections to reach the desired length of the hoist (See
Chart Page 7). The track sections are attached using the splice plates as noted
below with 3/8”x 3/4" carriage bolts and lock nuts. The splice plates must be
installed on the outside of the track section. See Figure 2
Figure 2
4. Lay the hoist down on the ground with the brake spring towards the ground.
5. Slide the carriage onto the track section from the “Top” of hoist, with the flat
surface of the carriage facing away from the base section. See Figure 3
Содержание AH-300
Страница 10: ...8...