Limitations 

Saferoads HV2 Safety Barrier has been tested up to MASH TL-3 & MASH TL-4 requirements, as required by FHWA. 
Installations not in accordance with this manual or impacts outside of MASH TL-3 & MASH TL-4 testing, may result in 
unpredictable performance. 

Testing 

Saferoads HV2 Safety Barrier has successfully passed a variety of tests to ensure compliance with MASH 
requirements, including: 

 

MASH 4-10 (1,100C) – Test No. 690902-SFR7 

 

MASH 4-11 (2,270P) – Test No. 690902-SFR6 

 

MASH 4-12 (10,000S) – Test No. 690902-SFR8 

 

MASH 3-21 (2,270P) – Test No. 132266.01 Reverse Transition with Pinned Crash Cushion 

 

MASH 3-11 (2,270P) – Test No. 132266.3-11 BLON with SLED 

 

MASH 3-44 (2,270P) – Test No. 132266.3-44 CIP with SLED 

Barrier Segments 

A HV2 Safety Barrier installation is constructed from a series of individual barrier segments. Each segment is 
constructed from steel with concrete ballasting. The dimensions of each segment are: 

Installed length 

19ft (5,800mm) 

Segment length 

19ft 2in (5,846mm) 

Segment width 

18in (450mm) 

Segment height 

35in (900mm) 

Weight 

4600lbs (2,088kg) 

 

 

 

Содержание HV2 Safety Barrier

Страница 1: ...W www saferoads com au T 61 3 5945 6600 E sales saferoads com au USA Version 1 4 March 2019 ...

Страница 2: ...tations 3 Testing 3 Barrier Segments 3 Minimum Deployment 6 End Treatment 6 Length of Need 6 Beginning of Length of Need 6 End of Length of Need 7 System Deflection 8 Working Width 9 Site Considerations 10 Barrier Deployment 10 QuadGuard Crash Cushion Deployment 11 SLED Crash Cushion Deployment 12 Maintenance and Repair 13 Safe Work Method Statement 14 ...

Страница 3: ...ue connectors allow Saferoads HV2 Safety Barrier to offer high containment and low deflection while remaining economical to transport and deploy with no time consuming anchoring required Saferoads HV2 Safety Barrier provides several unique advantages over other temporary barrier systems including High containment Low deflection Safe consistent and reliable redirection Fast deployment and retrieval...

Страница 4: ...H requirements including MASH 4 10 1 100C Test No 690902 SFR7 MASH 4 11 2 270P Test No 690902 SFR6 MASH 4 12 10 000S Test No 690902 SFR8 MASH 3 21 2 270P Test No 132266 01 Reverse Transition with Pinned Crash Cushion MASH 3 11 2 270P Test No 132266 3 11 BLON with SLED MASH 3 44 2 270P Test No 132266 3 44 CIP with SLED Barrier Segments A HV2 Safety Barrier installation is constructed from a series ...

Страница 5: ...au USA Version 1 4 March 2019 Page 4 Barrier segments are fastened by an integrated interlocking joiner which simply slides together when barriers are lowered into position These connectors are bidirectional allowing barriers to be installed in either orientation ...

Страница 6: ... 4 March 2019 Page 5 Barrier segments feature three integrated lifting points Barriers can be safely lifted from the centre lifting point or the outer two lifting points Barrier segments can be stacked for storage or transport but appropriate bearers should be used between layers ...

Страница 7: ...tion SLED Crash Cushion with Transition Kit or tapered barriers outside the work zone Length of Need Beginning of Length of Need When using an anchored redirective crash cushion at the beginning of the system the length of need begins at the crash cushion BLON Refer to the crash cushion product manual for further information When using a non anchored or non redirective crash cushion at the beginni...

Страница 8: ... manual for further information When using a non anchored or non redirective crash cushion at the end of the system the length of need ends midway along the 3rd last HV2 Safety Barrier segment 73 8ft 22 5m from the end of the system Note a SLED to HV2 Transition Kit is required see pages 12 and 13 for detail When tapering HV2 Safety Barrier outside the work zone the length of need ends at the conn...

Страница 9: ...27m 50mph 80km h 3ft 11in 1 18m 3ft 2in 0 95m 2ft 4in 0 71m 1ft 7in 0 48m 10in 0 24m 43mph 70km h 3ft 5in 1 03m 2ft 9in 0 83m 2ft 1in 0 62m 1ft 5in 0 42m 9in 0 21m 37mph 60km h 2ft 11in 0 89m 2ft 4in 0 71m 1ft 9in 0 53m 1ft 3in 0 36m 8in 0 18m 31mph 50km h 2ft 6in 0 74m 2ft 0 59m 1ft 6in 0 44m 1ft 0 30m 6in 0 15m 25mph 40km h 2ft 0 59m 1ft 7in 0 48m 1ft 3in 0 36m 10in 0 24m 5in 0 12m Crash Tested ...

Страница 10: ...aximum lateral position of any major part of the barrier or vehicle after impact MASH TL 3 2 270kg Pickup The TL 3 Working Width is a constant 1 81m as the vehicle does not roll over the top of the barrier MASH TL 4 10 000kg Truck The below image shows the working width of the TL 4 Truck at 1m intervals above the ground The working width varies depending on the height of the work zone that require...

Страница 11: ...d whenever possible personnel should remain on the non traffic side of the installation Also ensure appropriate lifting equipment is used and operated by competent personnel 1 Beginning at the upstream end of the installation unload the first barrier segment and place in the correct position Orientation is not important as segments are bidirectional 2 Working downstream of the first barrier segmen...

Страница 12: ...adGuard parts excluded for clarity 2 Align the connectors of the HV2 Transition with the connectors of the end HV2 Barrier segment while lowering the QuadGuard and HV2 Transition assembly into position 3 Anchor both the HV2 Transition and the QuadGuard The HV2 Transition should be anchored using Hilti HIT RE 500 V3 epoxy or equivalent QuadGuard should be anchored according to the QuadGuard product...

Страница 13: ...anual and position at the end of the system 2 Clamp the transition panels to the end HV2 Barrier segment and using the transition panels as a template drill four 20mm holes through both sides of the HV2 Barrier The below diagram shows the recommended hole pattern A 4 100mm access hole should also be cut through one side of the barrier in the approximate position shown This hole should be on the wo...

Страница 14: ...secures each Beam in place installed in the centre of the beam under the HV2 Connectors through the gap between the Barriers Washers are to be installed each end and a Nyloc Nut is to be used Maintenance and Repair No ongoing maintenance is required for the Saferoads HV2 Safety Barrier Barriers should be inspected regularly and any damaged segments should be replaced immediately Damaged barrier se...

Страница 15: ...parts should be clear when lowering and joining barrier segments Appropriate PPE should also be worn Abide by worksite speed limits and transport routes Ensure nearby personnel are wearing high vis clothing Personnel should wear appropriate clothing and foot wear for environmental conditions Where required personnel should wear appropriate hearing protection Where required personnel should wear ap...

Отзывы: