Car lift installation, operation and maintenance manual
Type:4SF-4000C
8
Main bridge plate 1 pieces
<4>:Remove the packing bags, take A:2 approach spans, B:3 tubing, C:1 tool plates, D:1 power units, E:1 parts cases, and put them in the free
space.
Approach spans 2 pieces
Oil drop pan 3 pieces
Tool tray 1 piece
<5>:
Remove the belt and remove the screws from the main and secondary posts and the packing frame. Take the main and the auxiliary Posts off
and put them in the free space