INTEGRA-X User Manual
INSTALLATION
SAF Tehnika JSC
9
Initial setup in indoor environment upon delivery (“bench
test”)
Before Integra-X FODU installation on site it is highly recommended to check the delivered
package contents in safe indoor environment.
Here we also recommend performing initial setup and operational verification test (“bench
test”) – for detailed instructions please check video on SAF Tehnika Youtube channel:
Configuration and Installation video series - EPISODE 1 of 2
In each individual bench test use so many office paper packs that devices do not have any MSE
alarms and Rx level is kept around -40…-30 dBm. If necessary adjust also Tx power for devices.
As this is only a rough device general operation test with no antennas attached then devices
will show low XPD Estimated parameter values and corresponding alarms which for such
“paper pack” installation is normal and should be ignored. XPD could be improved till
recommended values above 25 dB by moving paper packs and Integras itself obtaining better
alignment between the devices.
As Integra devices emit high power microwave radiation it is recommended that devices are
powered on only when paper packs are placed between them. It is also recommended to keep
at least 1m distance from powered devices and not to look directly into their diplexer flanges
as concentrated microwave radiation is harmful to human eyes.
Figure 2-2 Integra-X link bench test with office paper packs