
Saberz Project
M Chassis Installation Guide
P
ROFFIE
B
OARD
I
NSTALL AND
W
IRING
Version 1.9.5_b
–
September 18, 2022
•
Page 20
10
ProffieBoard Install and Wiring
10.1
Suggested Wiring Diagram
10.2
ProffieBoard Pads
Connect the wires to the under-side as seen below. Remember to bridge LED 2 and 3 as seen in the above diagram.
Note: As always, be sure to be completely read and be completely familiar with the vendor’s documentation.