Assembly and operating manual
rtv.sabaj.pl/en/home/
14.
Allen keys
1 set
size 3; 5
15.
Plastic spacers (15mm)
4 pcs.
16.
Plastic spacers (10mm)
4 pcs.
Additional tools required:
No.
Tool name
Pic.
1.
Cross screwdriver
2.
Socket wrench
size 7; 10; 13
3.
Allen key
size 6
4.
Concrete anchors suitable for your building
Lift assembly
The lift can be mounted on the wall or ceiling. All the necessary accessories are attached.
However the type of concrete anchors need to be matched according to your wall/ceiling type.
Please consider at least 150 kg of load per set.
1. Open the package and unpack the contents. Concrete anchors have to be choosen by your
installer, accordingly to the type of wall/ceiling
– to withstand at least 150 kg of weight.
Choose the necessary elements depending on the chosen assembly method:
a. to the wall: wall beams
b. to the ceiling: strengthening ceiling bracket and upper plate
2. Connect the control box to the lift (fig. 1) and open the lift to the maximum (fig. 2a and 2b).
To do this, shortly press the
DOWN button
on the control box