10
PLUMBING INSTRUCTIONS
1. The Typhoon is designed for a water supply line of 1” pipe. Plumb from pool return line with a 1”
PVC pipe “stubbed up” at the deck positioned at the base of the ladder. Refer to
FIG. 1
on page 2.
FIG. 1
is for reference only. Assembled slide should be placed in its correct location and the “stub
up” location marked and installed before mounting the slide to the deck. “Stub up” should be dark
grey PVC to match the plumbing assembly of the slide.
Note
: “
Stub up” should extend above the
deck 18” in height. It can be cut to proper length further in the installation process.
2. If a garden hose is to be used, a garden hose
adapter fitting is included with the slide. Assemble
the pieces as shown in Figure 12 and attach to the
end of the PVC plumbing assembly at the base of
the ladder.
3. Proceed to the following section for
ON-DECK
MOUNTING
. After the slide has been mounted to
the deck, attach the “stub up” as necessary to the
plumbing assembly installed in the ladder.
4. The Typhoon can handle up to 20 gallons per
minute. Water flow is to be regulated using the ball
valve near the base of the ladder.
Fig. 12
(17)
(16)
(21)