700-9000
6.14.13
30
APPENDIX E: New Construction Jig
NEW CONSTRUCTION ANCHOR JIG
WHEN ASSEMBLING THE FLUSH DECK ANCHORS TO THE NEW CONSTRUCTION JIG,
MAKE SURE THAT THE DISTANCE BETWEEN THE TOP SUFACE OF THE JIG AND THE TOP
OF EACH ANCHOR IS 2.5”, AS SHOWN IN THE DIAGRAM ABOVE.
* FLUSH DECK ANCHORS (300-6700) SOLD SEPARATE *KIT NUMBER 300-6700A (QTY 4)