Rutland County Garden Furniture Burley Скачать руководство пользователя страница 1

 

Assembly Instructions

 

 

Burley/Greetham 6ft 

tool store 

 

 

Before you commence the assembly process we recommend that you read these instructions thoroughly 
beforehand to familiarise yourself with the assembly process and to also check that you have the correct 
components. If for any reason you need assistance, you can find our contact details on the final page of 
these instructions. 

We highly recommend that any assembly is carried out on a flat, level surface if possible and that you 
use another person to assist you if necessary.

  

 

Package contents 

Tools required

 

2 x End panels 
1 x Back panel 
1 x Base 
1 x Floor 
1 x Roof 
1 x Door 
16 x Short green screws 
8 x Long green screws (For the base only) 
12 x 38mm black screws (For doors only) 
2 x Spacer blocks 

Electric screwdriver with No2 Pozidrive bit 
Or No2 Pozidrive Screwdriver

 

 

 

Burley Tool Store 

Содержание Burley

Страница 1: ...d our contact details on the final page of these instructions We highly recommend that any assembly is carried out on a flat level surface if possible and that you use another person to assist you if necessary Package contents Tools required 2 x End panels 1 x Back panel 1 x Base 1 x Floor 1 x Roof 1 x Door 16 x Short green screws 8 x Long green screws For the base only 12 x 38mm black screws For ...

Страница 2: ...and the left hand end panel or right hand for the reversed roof version upright on a flat level surface Step 3 Step 4 Arrange the 2 spacer blocks on the ground adjacent to the end panel as shown in the photo above Now place a back panel on the blocks at 90 to the end panel aligning the 2 panels ready for fixing Using the shorter green screws provided attach the batten on the back panel to the post...

Страница 3: ... blocks from beneath the back panel and then slide the base into position as shown so that it locates in the gaps in the side panel battens Now add the right end panel again locating the base in the gaps in the side panel battens Step 7 Step 8 Secure the right side panel in place with shorter green screws Attach the base to the end panel front posts using 2 of the longer green screws for each side...

Страница 4: ...again using 2 of the longer green screws for each side Lay the floor section in the base and then gently lower the roof into place as shown Step 11 Step 12 Check that the front batten ends sit flush with the posts as shown Now attach the roof to each end panel post with shorter green screws Secure the rear of the roof using shorter green screws as shown Your log store is now complete If your log s...

Страница 5: ...t the gap between the door and post is consistent at top and bottom then secure the top hinge in place using more of the black hinge screws Step 15 Step 16 To fit the latch keeper plate shut the door and hold the latch in the horizontal position Now fit the keeper and mark its correct fixing position on the post using a pencil or bradawl before securing it in place using the screws provided Your B...

Отзывы: