3 Product Installation
Please ensure that you have carefully read the section of
“Preparation before Installation”.
Make sure that the requirements set forth in section of
“Preparation before Installation” have been met.
3.1 Installation Procedure
3.2 Confirmations before Installation
Before installation, please confirm the following points:
Whether ventilation requirements are met for the switch
Whether the requirements of temperature and humidity are met for the switch
Whether power cables are already laid out and whether the requirements of electrical current are met
Whether related network adaption lines are already laid out
3.3 Installing the RG-S2900G-E Series
Precautions
Install the RG-S2900G-E to the rack
Connect the system grounding
Connect the power supply
Connect the external interface cable
Bundle the cables.
Check the installation
End