Ruijie RG-ES100 Series Switches Hardware Installation and Reference Guide
Product Installation
3 Product Installation
Please ensure that you have carefully read Chapter 2.
Make sure that the requirements set forth in Chapter 2 have been met.
3.1 Installation Flowchart
3.2 Confirmations before Installation
Before installation, please confirm the following points:
Whether ventilation requirements are met for the switch
Whether the requirements of temperature and humidity are met for the switch
Whether power cables are already laid out and whether the requirements of electrical current are met
Whether related network adaption lines are already laid out
3.3 Installing the RG-ES100
Precautions
During installation, note the following points: