background image

 

 

锐捷以太网交换机快速安装指南

 

Ruijie Ethernet Switches Installation Quick Start 

本指南适用于

RG-ES08

RG-ES08G

,执行标准

:GB 4943.1-2011    GB/T 9254-2008

 

This quick start applies to RG-ES08 and RG-ES08G,

 the execution standards include GB 4943.1-2011 and 

GB/T 9254-2008.

 

设备安装

 

    Install the Device 

安装到墙壁

 

Wall Mounting 

第一步:根据交换机底部的槽位,在墙上定位并钻孔,两边各自拧入一颗

M3

螺丝(自备)。留出螺丝头用

于挂壁。

 

Step1: Drill two holes in the wall based on the distance between the two slots on the bottom panel of the 

switch.  Put  and  tighten  two  M3  screws  (self-prepare)  into  the  holes,  and  keep  an  appropriate 

distance between the inner edge of the screw head and the wall to ensure that the switch can be 

hung on the screws firmly. 

第二步:将交换机底部的槽对准螺丝头,滑入并扣紧。

 

Step 2: Align the slots of the switch to the screw heads, and slip the switch to make it fixed on the screws 

firmly. 

Отзывы: