background image

A

B

2.1

  

Floor Installation

Connect and align back position 

Repeat Floor (B) 

to

 

middle position

 

Repeat Floor (B) 

and install 

Screws (AA) 

9 places; keep panels aligned 

and even while installing screws.

b.

Connect and align middle position 

Repeat Floor (B) 

to

 Front Floor (A) 

and install 

Screws (AA) 

9 places; keep panels aligned and even while installing screws.

a.

AA  

(9)

A

B

B

HELPFUL HINT: 

Pilot holes may be drilled for the screws using a 1/8" drill bit.

CAUTION: 

Do not overtighten screws.

AA  

(9)

HELPFUL HINT: 

Pilot holes may be drilled for the screws using a 1/8" drill bit.

CAUTION: 

Do not overtighten screws.

Содержание 5L30

Страница 1: ...e for water to run away from the shed location BEFORE YOU BEGIN PREASSEMBLY Thoroughly review all assembly steps it is important that the steps are followed in the correct order Review the parts list...

Страница 2: ...n NP 5J22 FF 8 Roof Pin Assembly Tool M3 5J22 GG 1 Accessory Bracket 5H88 12 Roof Front Roof 5L08 J 1 Repeat Roof 5L14 M 2 Roof Brace 5L36 RB 3 Safety Glasses Phillips Screwdriver Rubber Mallet Liquid...

Страница 3: ...18 4 15 16 24 23 9 16 24 24 3 5 8 3 5 8 5 75 1 2 120 0 24 7 8 55 1 4 ANCHOR LOCATIONS CARE USE Shed can be cleaned with water and mild detergent as necessary DO NOT USE ABRASIVE DETERGENTS MATERIALS O...

Страница 4: ...ON Drill through top surface of floor only d A Using a rubber mallet and screwdriver punch out the screw holes along the connection edge of both Repeat Floors B a B B Using a utility knife cut the lon...

Страница 5: ...b Connect and align middle position Repeat Floor B to Front Floor A and install Screws AA 9 places keep panels aligned and even while installing screws a AA 9 A B B HELPFUL HINT Pilot holes may be dri...

Страница 6: ...ut the screw holes on the top of Repeat Left Side C 2 places a C Snap Repeat Left Side C into the back position Repeat Floor B b C C Screw Holes ALIGN ALIGN click Hold Repeat Left Side C upright to pr...

Страница 7: ...D Installation Connect Left Back D into dovetails of Repeat Left Side C b Engage snaps on bottom of Left Back D into Repeat Floor B c D D Using a screwdriver punch out the screw holes on the top of L...

Страница 8: ...e back position of Repeat Floor B b Hold Repeat Right Side E upright to prevent it from falling until Right Back F is installed c Using a screwdriver punch out the screw holes on the top of Repeat Rig...

Страница 9: ...Engage snaps on bottom of Right Back F into Repeat Floor B c Using a screwdriver punch out the screw holes on the top of Right Back F 4 places a F F Screw Holes _E DETAIL 3 3_B SCALE 1 1 HELPFUL HINT...

Страница 10: ...ls D and F Position connectors in slots and slide down to snap in place d 2 1 1 click 3 4 Wall Panel C Repeat Left Side Installation Using a screwdriver punch out the screw holes on the top of Repeat...

Страница 11: ...ddle position Repeat Left Side C b 1 2 C C OVERHEAD VIEW DETAIL 3 1_B SCALE 1 1 DETAIL 3 3_B SCALE 1 1 DETAIL 3 4_B AND 3 5_B SCALE 1 1 DETAIL 3 6_B AND 3 7_B SCALE 1 1 C C ALIGN ALIGN Install Wall Co...

Страница 12: ...o be drilled through both walls b 3 5 Wall Panel G Installation Align the lap joint between Repeat Left Side C and Front Left Side G c Using a screwdriver punch out the screw holes on the top of Front...

Страница 13: ...on Install Wall Connector Q 5 places connecting Repeat Left Side C and Front Left Side G Position connectors in slots and slide down to snap in place e 2 1 click OVERHEAD VIEW G G 1 Q C E E Screw Hole...

Страница 14: ...6_B AND 3 7_B SCALE 1 1 E E Install Wall Connector Q 5 places connecting Repeat Right Side E and middle position Repeat Right Side E Position connectors in slots and slide down to snap in place d OVER...

Страница 15: ...on the top of the middle position Front Right Side H 2 places a Drill a pilot hole using 1 8 drill bit in front lower corner at location indicated by screw target Note This pilot hole is to be drilled...

Страница 16: ...H e OVERHEAD VIEW H E H click ALIGN ALIGN 2 1 click 1 Q 4 0 Roof Panel M back position Installation M RB Install one Repeat Roof M onto back section The overlap edge of roof points toward the back of...

Страница 17: ...e roof A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location d RB M AA 4 Ensure Repeat Roof M is positioned against the back wall tongues From...

Страница 18: ...ap edge of roof points toward the back of the shed Align tongues on top of side walls into grooves in roof a Slightly raise front edge of roof enough to allow positioning of Roof Brace RB onto the sid...

Страница 19: ...f the shed should hold down the edge of the roof firmly at each screw location d Make sure middle location Repeat Roof M is positioned tightly against the back Repeat Roof M section Install Roof Pins...

Страница 20: ...oof gable edge toward front of shed Align tongues on top of side walls into grooves in roof a Slightly raise front edge of roof enough to allow positioning of Roof Brace RB onto the side walls as show...

Страница 21: ...ront Roof J is positioned tightly against the middle Repeat Roof M section Install Roof Pins FF in four places If necessary use Roof Pin Assembly Tool GG to pull the roof down c GG FF 1 Insert pin in...

Страница 22: ...shing Installation Install Screws AA into 10 locations shown at bottom of wall panels to secure walls to floor a AA 10 HELPFUL HINT Pilot holes may be drilled for the screws CAUTION Do not overtighten...

Страница 23: ...it remains stable and the site remains level In areas of high winds it is recommended to anchor shed to platform or ground by holes in floor at designated location and secure with the proper fasteners...

Отзывы: