14
M0412-1 ver 3.0
3 MAINTENANCE AND SERVICE
The swivel tool changers and the tool attachments must be maintained regularly to ensure
proper function. The specified intervals are approximate and valid under normal conditions,
corresponding to 2 tool changes per minute during 2 work shifts per working day, i.e. 42.000 tool
changes per month. Under extreme conditions, such as dirty environments or extreme robot
movements, the intervals should be shortened. Consider the table as a guide and update as
your production experience of each system increases.
NOTE!
.before any maintenance activities are carried out.
NOTE!
Swivel tool changers must only be dismantled and repaired by Robot System
Products during the warranty period. Otherwise the warranty will not be valid.
3.3 Maintenance scheme
3.3.1 Every second week
The following maintenance activities should be carried out every second week.
Activity
Equipment
Description
Inspection
Swivel tool
changer
General
Visual inspection of swivel tool changer,
rotation stop and cables (
Looking balls
Check locking balls (
Air sealings
Check air sealings (
Spring-loaded pins
Check spring-loaded signal pins (
Tool attachment
General
Visual inspection of tool attachment and
cables (
Cleaning
Tool attachment
Signal contacts
Clean contact surfaces (
3.3.2 Every six-months or 250,000 tool changes
The following maintenance activities should be carried out every six-months or 250,000 tool changes.
Activity
Equipment
Description
Cleaning
and
lubrication
Swivel tool
changer
Looking balls
Clean locking balls and add new
lubrication, (
Air sealings
Clean air sealings (
Spring-loaded pins
(electrical versions
only)
Clean spring-loaded signal pins (
Tool attachment
Locking cavities
Clean the cavities of the locking balls.
Contact surfaces
Clean the contact surfaces of air
sealings (
Содержание P0108A
Страница 2: ...2 M0412 1 ver 3 0 ...
Страница 27: ...M0412 1 ver 3 0 27 ...
Страница 28: ...28 M0412 1 ver 3 0 ...