Rowlinson Garden Products Garden Chest Скачать руководство пользователя страница 1

No.

Components

Qty.

1

Floor

1

2

Back panel

1

3

Left panel

1

4

Right panel

1

5

Front boards

2

6

removable front panel

1

7

Lid

1

8

Felt

1

9

Stay bar

1

10

Bargeboard

1

1

2

3

12

6

8

Before assembly

We recommend that time is taken to 

read the instructions before starting 
assembly, then follow the easy step by 
step guide.The instruction sheet is only 
a guide to the assembly.
Certain items may not be shown     
to scale.

Check all components prior to assembly

This product should be assembled

by no less than 2 people

Drill all components where indicated

x 2

pre-drill

5

4

7

11

10

9

No.

Fixing kit

Qty.

11

T-hinges

2

12

Hook and eye set

1

14

25mm screws

14

13

50mm screws

5

15

38mm nails

27

16

13mm felt nails

50 

Recommended tools for assembly

Cross head screw driver           

Hammer

Spirit level 

Sharp knife

Drill 

4mm drill bit 

13mm

Felt

nails

13mm

Felt

nails

13mm

Felt

nails

13mm

Felt

nails

7. Roofing felt

Lay the felt over the lid ensuring that there is an equal overhang all round. Fold the felt over the front of the lid and
secure to the lid framing using 15 x 13mm felt nails evenly spaced. Tension the felt over the back edge of the lid, fold
down and secure using 15 x 13mm felt nails evenly spaced to the frame of the lid. Neatly fold the felt down on each side
of the lid and secure using 10 x 13mm felt nails evenly spaced per side. Once the felt is fully secured trim off any excess
felt. with a sharp knife.

8.Bargeboard

Position the bargeboard against the front edge of the lid, ensure it is flush along the top edge and ends. Secure in place
using  5 x 38mm nails as shown.

38mm

Garden Chest

Assembly Instructions

English SS019G

2006 © Rowlinson Garden Products Ltd

If in doubt of any aspect regarding the assembly, use or safety of your garden chest please contact us :

Help Line (Normal Office Hours)  01829 261 121

ROWLINSON GARDEN PRODUCTS LIMITED
Unit 2 Green Lane
Wardle Nr. Nantwich
Cheshire
CW5 6BN
Tel : 01829 262 080
Fax : 01829 262 089

We constantly improve the quality of our products, occasionally the
components may differ from the components shown and are only
correct at time of printing. We reserve the right to change the
specification of our products without prior notice.

Important information

Shiplap buildings come ready stained but this is only a preparatory treatment. To VALIDATE the guarantee, the building must be
properly treated with a recognised external wood preserver WITHIN 3 MONTHS of assembly and RE-TREATED ANNUALLY
thereafter.The building must also be erected on 50mm x 50mm treated wooden or similar bearers (These are not supplied with the kit.)
ground contact must be avoided.
Timber Information.
As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry
spells the material may lose some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive
rain there will be a certain amount of swelling throughout the wooden panels. This process can not be avoided. If you have problems
with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the building or the amount of air passing
over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.

Отзывы: