Rowlinson Garden Products DOGKENLRG Скачать руководство пользователя страница 1

1

2

3

6

9

Before assembly

We recommend that time is taken to 

read the instructions before starting 
assembly, then follow the easy step by 
step guide. The instruction sheet is only 
a guide to the assembly. 
Certain items may not be shown     
to scale. 

Check all components prior to assembly

This product should be assembled

by no less than two people

Drill all components where indicated

x 2

pre-drill

5

4

7

11

8

Recommended tools for assembly

Cross head screw driver           

Hammer

Saw 

Sharp knife

Drill and 3mm drill bit 

Large Dog Kennel

Assembly Instructions

English SS293B

No.

Components

Qty

.

1

Floor

1

2

Front panel

1

3

Right-hand side panel

1

4

Left-hand side panel

1

5

Back panel

1

6

Lid

1

7

Lid stay

1

8

Roof felt

1

9

Side bargeboard

2

10

Front/back bargeboard

2

No.

Fixing Kit

Qty

.

11

T-hinges

2

12

50mm screws

9

13

40mm screws

14

14

25mm screws

14

15

30mm nails

18

16

10mm felt nails

50

Important Note:

This kennel does not come with a pre cut
door way. The assembler must cut the
door way into either the front panel or
right-hand side panel before assembly.

Drill pilot holes
with a 3mm drill
bit for each screw
in this section.

3mm

Drill

40mm

40mm

40mm

6. Secure walls to floor

Secure the front and back panels to the floor using 4 x 40mm screws for each. screw through the shiplap of the panels
into the floor bearer. Secure each end panel using 3 x 40mm screws. screw through the shiplap into the ends of each
floor bearer.

30mm

30 mm

30mm

30mm

7.Bargeboard

Attach the side bargeboards to each side of the lid using 4 x 30mm nails for each board. Then fit the front and rear
bargeboards using 5 x 30mm nails for each board.

Important information

Shiplap buildings come ready stained but this is only a preparatory treatment. To 

VALIDATE

the guarantee, the building must be properly

treated with a recognised external wood preserver 

WITHIN 3 MONTHS

of assembly and 

RE-TREATED ANNUALLY  

thereafter.

Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building. Placing the
building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions.
If the building is to sit on soil or grass it 

MUST

be erected on pressure treated wooden 50mm x 50mm or similar bearers 

(These are

not supplied in the kit). 

Rowlinson Garden Products recommend using pressure treated bearers with all buildings on any type of base.

Timber Information.

As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry
spells the material may lose some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain
there will be a certain amount of swelling throughout the wooden panels. This process can not be avoided. If you have problems with
certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the building or the amount of air passing over the
building. During hot spells spray water directly onto the panels with the aid of a garden hose.

If in doubt of any aspect regarding the assembly, use or safety of your building please contact us:

Help Line: (Normal Office Hours)  01829 261 121

Email: [email protected]

ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane
Wardle Nr. Nantwich
Cheshire
CW5 6BN

www.rowgar.co.uk

10

2015 © Rowlinson Garden Products Ltd

We constantly improve the quality of our products, occasionally
the components may differ from the components shown and are
only correct at time of printing. We reserve the right to change the
specification of our products without prior notice.

Отзывы: