background image

                  Roverpet

   20 Kiji Dava Circle   Prescott, Arizona  86301    

800-658-5925

    

[email protected]

 

 

Page 1 of  3 

 

Roverpet #66PR 

– 6’x 6’  Puppy Rail Assembly Instructions 

 

Inventory List for The Roverpet #66PR Puppy Rail System:

 

 

(2)

 

#PR72LB

 

72” Long Support Bar 

 

(2) #72CB

 

72” Long Crossbar    

(2) #PRS66 

Crossbar Support and  

(6)

 

2”, 3”, 4”, 5”, 6” or 8” high legs (depending on style of Roverpet Puppy Rail System ordered) 

 

Assembly Procedure 

Special Notes:

 If your Roverpet 

6’x6’ whelping box consists of a door panel, it needs to be configured with the door located on 

the right or center of the whelping box side to allow door hinge clearance. 

 

 

Assembly of the Roverpet Puppy Rail System needs to be done outside of your existing Roverpet whelping box, than installed 

into the whelping box once fully assembled. 

1.)  Unpack contents of shipping carton and compare to inventory list above. 
2.)  Install 

(4) 

legs of the Roverpet Puppy Rail System into the 4 small leg whole locations on both #PR72LB. 

 

 

 

 

 

Отзывы: