Section 5 Operating Instructions
SG10XY Manual
www.rottlermfg.com
5-10
Machining Seats
1. After all height settings are made, you now are ready to cut seats. Cut counter bores
2. Set “feed rate”.0008 is a good starting point.
3. Set “spindle RPM” 400 is a good starting point.
4. Set “retract height”
5. Set ” workhead float after auto cycle” to float or not to float after auto cycle.
6. Best to set “retraction height” to “lower cutter head over pilot” height and uncheck “float after auto
cycle” on the first seat cut. This way if the seat doesn’t cut you can use the additional depth buttons
and auto cycle without float.
7. Float workhead over seat to be machined.
8. Press “Rapid to valve guide height” MOVE button. This will lower spindle into position just above guide
or pilot.
9. Tap “lower cutter head over pilot” height MOVE button. This is a JOG button and only moves the
spindle down when it is being pressed. Let up and spindle stops. Align the pilot and keep taping this
until the preset depth is met, workhead float will automatically switch to clamp.
10. Press “AUTO CYCLE” This will “float workhead”, lower spindle to “start cutting height”, dwell to center
and “clamp workhead”, turn urn on spindle, cut to “finish cutting depth” and then retract to preset
“retract height” floating if checked.
11. At this point, if you have retracted to “lower cutter head over pilot” and workhead is not floating, you
can push any of the additional depth buttons and tap “ auto cycle without float” a box will appear
asking if you want to add this depth to your “finish cutting depth” if you press yes, the “finish cutting
depth” figure you have entered will be changed. If you press no it will cut the additional depth but not
change your pre entered figure.
Reaming Guides
1. After all heights are set you are now ready to ream guides.
2. Set “feed rate” .030 is a good starting point.
3. Set “spindle RPM” 200 is a good starting point.
4. Set “retraction height”
5. Set “workhead float after auto cycle “
6. Float workhead over guide to be reamed.
7. Press “rapid to valve guide height”
8. Tap “start reaming height” jog button, works same as “lower cutter head over pilot” button.
9. Press “finish reaming depth “ AUTO button. Spindle will start and ream to the finished reaming depth
figure, slow to preset retract RPM and retract to start reaming height while turning, stop turning and
retract to the preset “retract height” floating is checked.
Содержание SG10XY
Страница 2: ......
Страница 4: ......
Страница 10: ...Section 1 Introduction SG9MTS Manual www rottlermfg com 1 5...
Страница 19: ...Section 2 Installation SG10XY Manual www rottlermfg com 2 8 Machine Dimensions...
Страница 20: ...Section 2 Installation SG10XY Manual www rottlermfg com 2 9 Clearance Dimensions 78 110 Requird Clearances...
Страница 71: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 17 Rottler Six and One Instructions...
Страница 72: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 18...
Страница 73: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 19...
Страница 84: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 30...
Страница 90: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 5...
Страница 93: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 8 Spindle Lock Nut Service Procedure...
Страница 97: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 12 Setting the Play of Z Axis Ball Screw...
Страница 98: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 13...
Страница 106: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 3 Machine Parts Base Table and Riser Assembly...
Страница 110: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 7 Base Assembly 88 89 87...
Страница 113: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 10 Spindle Assembly TOTAL LEN 30 125...
Страница 117: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 14 Transmission Assembly...
Страница 123: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 20 Solenoid Valves...
Страница 129: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 26 Air Line Diagram...
Страница 130: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 27...
Страница 132: ...Section 9 Options SG10XY Manual www rottlermfg com 9 2...
Страница 134: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 2...
Страница 135: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 3...
Страница 136: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 4...
Страница 137: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 5...
Страница 138: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 6...
Страница 139: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 7...
Страница 140: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 8...
Страница 141: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 9...
Страница 142: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 10...
Страница 143: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 11...
Страница 144: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 12...
Страница 145: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 13...
Страница 146: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 14...