4.1
[en] 02/2014
Installation and operating manual - NK 31
4.1 Delivery and packing
The system is delivered in suitable packing in ac-
cordance with the selected shipping method and
delivery conditions.
4.2 Transport damage
Regardless of the care taken at the factory, the
screw compressor module may be damaged dur
-
ing transport. Therefore, the screw compressor
module should be checked for damage following
each transport.
Attention
A damaged module must not be put into opera-
tion under any circumstances. In case of trans-
port damage, damage claims must be secured in
your interest by calling in representatives of the
transport company promptly for determination of
damage, i.e.:
A) Externally recognizable damage or losses
– must be certified with a corresponding note
on the freight bill before the merchandise is
accepted. With rail transports, a record of the
facts must also be requested from the rail-
road.
– With postal consignments, the damage must
be certified in writing by the postal service
before accepting damaged packages etc.
B) In case of damage which cannot be
recognized immediately
– which are discovered during unpacking, the
carrier must be notified immediately and in
writing.
– If possible, leave packing materials and dam-
aged products in an unaltered state until the
facts are recorded.
Above all, comply with the complaint deadlines.
The deadlines are as follows:
a) GERMAN FEDERAL RAILWAY:
within 7 days
(Paragraph 81/82 of EVO - German Regula-
tions Concerning Carriage by Rail)
b) FORWARDING AGENT:
within 7 days
(Paragraph 60ADSp - General German For-
warders’ Conditions)
c) POSTAL SERVICE:
immediately, at the latest 24 hours following
delivery of the shipment
Note
Each product is checked in accordance with the
type and quantity prior to shipment. Should you
nevertheless have a reason for complaint, please
specify the Order No.
4 Transport