[ 63 ]
M a i n t e n a n c e l o g
Please tick the maintenance work done and enter actual values, as appropriate. Observe the information
in chapters 6 and 5.1.
Inspection and maintenance work
Initial
1. Maintenance
2. Maintenance
3. Maintenance
4. Maintenance
start-up
Date
Leak test heating line connections
Leak test DHW line connections
Soundness test gas connection
Visual inspection of electronic
components
Checking the tightness of electrical
connections
Function test and cleaning the
condensate drain
Testing the flue gas connection
Cleaning the combustion chamber
Cleaning and checking the burner
Checking the burner adjustment
(correct gas type)
Testing the gap of the ionisation and
ignition electrodes
Testing the burner inlet pressure
Cleaning the cylinder and silencer
hood
Starting the burner and testing values
- Carbon dioxide (CO
2
) in the flue
- Oxygen (O
2
) in the flue
- Carbon dioxide (CO
2
) in the ventilation
air (annular gap test)
- Flue gas temperature in the flue
- Testing the inrushing air
- Carbon monoxide (CO)
Confirm maintenance
(company stamp, signature)
Changes made to the control unit setting parameters/additional information regarding the heating system
Date Signature Comments
Содержание GasCompactUnit Series
Страница 17: ... 17 Fig 3 4 3 Flue gas system sets ...
Страница 55: ... 55 ...
Страница 58: ... 58 Fig 8 1 Residual head GSU 25 GCU 25 heating side Fig 8 2 Residual head GSU 35 GCU 35 heating side ...