
16 Service log
72
FA ROTEX ESU - 07/2008
16
Service log
Please enter the maintenance work carried out and the measured values in the service log.
Maintenance jobs
Initial start-up
1. Maintenance
2. Maintenance
3. Maintenance
4. Maintenance
Date
Checking fill level/
refilling storage tank water
Leakage testing heating pipe
connections
Leakage testing hot water pipe
connections
Checking electrical connections for
proper seating
Cleaning and testing the function
of the safety overflow
Cleaning the storage tank
and protective cover
Changes made to the control's adjustable parameters, plus other comments regarding the heating system
Date
Signature
Comments
008.15 144 44_
01
· Errors
and t
echnical mo
dif
ications
reserved · Orig
inal
inst
ruct
ions
08.15
144 49_
01 German
Содержание E-Solar Unit ESU 509
Страница 70: ...14 Notes 70 FA ROTEX ESU 07 2008...