background image

  DATE  REV.  CHANGE MADE

 11.23.05  A 

Updated Section 14 concerning oil capacities. 

 

Installer:  

 Please return this booklet to 

literature package, and give to 
lift owner/operator.

 

 

 

 

 

 

 

Thank  You

Trained Operators and Regular Maintenance Ensures Satisfactory 

Performance of Your Rotary Lift.

Contact Your Nearest Authorized Rotary Parts Distributor for Genuine Rotary Replacement 

Parts.  See Literature Package for Parts Breakdown.

© Rotary

®

, Printed in U.S.A., All Rights

Reserved.  Unless otherwise indicated, 

ROTARY, DOVER and all other trademarks are property of Dover Corporation and its affiliates.

Rotary World Headquarters

2700 Lanier Drive

Madison, IN 47250, USA

www.rotarylift.com

North America Contact Information

  Tech. Support:  p  800.445.5438

 

 

  f  800.578.5438

 

 

  e  [email protected]

 

  Sales:  p  800.640.5438

 

 

  f  800.578.5438

 

 

  e  [email protected]

World Wide Contact Information

World Headquarters/USA: 1.812.273.1622

Canada: 1.905.812.9920

European Headquarters/Germany: +49.771.9233.0

United Kingdom: +44.178.747.7711

Australasia: +60.3.7660.0285

Latin America / Caribbean: +54.3488.431.608

Middle East / Northern Africa: +49.771.9233.0

Содержание Sprinter SPO15

Страница 1: ...ft All rights reserved IN20379 CO6363 1 Rev A 11 22 2005 I N S T A L L A T I O N I N S T R U C T I O N S SPO15 SPO18 Sprinter SPO15 3A0 Lifts Capacity 11 000 lbs Standard SPO15 300 Series Lifts Capaci...

Страница 2: ...n using the standard supplied 3 4 x 5 1 2 lg anchors if the top of the anchor exceeds 2 1 4 above the oor grade you DO NOT have enough embedment Fig 1 Drill 18 3 4 dia holes in concrete oor using hole...

Страница 3: ...IEW FROM APPROACH SIDE All Star Washers are to be mounted on the Right side column to ensure grounding of overhead limit switch Star Washers are not needed when mounting to Left Side column Notice the...

Страница 4: ...power unit bracket using Push Nuts to hold in place Fig 8a Mount unit with motor up to column bracket and install 4 5 16 star washers and 5 16 Nuts Install and hand tighten Branch Tee to pump until O...

Страница 5: ...easier to tie off lower studs rst A Run cable stud up through the lower tie off plate and or bracket s and or spacer s depending on the lift model Fig 11 B Push cable up until stud is above top of car...

Страница 6: ...1 spacer provided For 15 height carriages use pattern four with 472 cable Has 1 spacer provided For 16 6 height with 472 long cable or for 14 6 height with 424 long cable both use pattern one 4 3 1 2...

Страница 7: ...e Install air line from lowering valve to union tee then to the right column air cylinder K Install air line from union tee to left column air cylin der Fig 14 L Mount lowering valve and bracket to co...

Страница 8: ...er valve is open 14 Oil Filling Bleeding Use Dexron III ATF or Hydraulic Fluid that meets ISO 32 speci cations Remove ll breather cap Fig 15b Pour in 8 quarts of uid Start unit raise lift about 2 ft O...

Страница 9: ...TABLE THREE PHASE LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE 208 240V 50 60Hz 197 253V 400V 50Hz 360 440V 440 480V 50 60Hz 396V 528V 575V 60Hz 518V 632V FOR 3 POWER UNITS Attach Box using M5 x 10 PHMS...

Страница 10: ...in Fig 18 so that the rounded edge top side of the gear teeth is fac ing upward Then install the three 3 3 8 16NC x 1 1 2 Lg HHCS 12 total for all 4 arms and 3 8 Spring Lockwashers into the gear and a...

Страница 11: ...l if required Repeat air bleeding of cylinders 19 Final Adjustments Raise lift to check equalizer cable tension Below carriage grasp adjacent cables between thumb and fore nger with about 15 lbs effor...

Страница 12: ...erved Unless otherwise indicated ROTARY DOVER and all other trademarks are property of Dover Corporation and its affiliates Rotary World Headquarters 2700 Lanier Drive Madison IN 47250 USA www rotaryl...

Отзывы: