6
A
A
B
C
A
B
A
B
C
10. Overhead:
With a ladder by each column, two people position the overhead
assembly onto column mounting brackets and fasten with (2) M10 x
20mm HHCS and (2) M10 lock nuts, Fig. 9. Tighten bolts at center of
overhead assembly.
11. Power Unit:
Put (2) M8 x 40Lg. HHCS through top holes in power unit bracket using
Vibration Pad to hold in place, Fig. 10. Install M8 flanged lock nuts until
bolt end is flush with end of nut.
A (2 each column) M10 x 1.5 20Lg. HHCS bolt
B (2 each column) M10 flanged lock nuts
A (2) M8 x 40Lg. HHCS
B Vibration pad
C (2) M8 lock nuts
Install power unit onto column extension, Fig. 11. Slide bolt/nut
combination into top set of holes and down to bottom of slot. Install
HHCS, Vibration Pad, and Flanged HHCS in bottom power unit holes
and tighten. (Be sure to place vibration pad between power unit and
column extension). Tighten top HHCS and Nut.
Install branch tee adapter to power unit, Fig. 12.
A (2) M8 x 40Lg. HHCS
B Vibration pad
C (2) M8 lock nuts
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Содержание SPOA3TE 600 Series
Страница 22: ...22 NOTES...
Страница 23: ...23 NOTES...