background image

I

N

S

T

A

L
L

A

T

I

O

N

I

N

S

T

R
U
C

T

I

O

N

S

R

O

T

A

R

Y

L

I

F

T

SPOA7, SPOA9, SPO9

Two Post Surface Mounted Lift

(200 Series Lifts)

V

A

L I

D A T

E

D

CERTIFIED

B

Y

E T

L

Entire contents © October 2000 by Rotary Lift.  All rights reserved.

IN20008

Rev. P

 10/04/00

I

N

S

T

A

L
L

A

T

I

O

N

I

N

S

T

R
U
C

T

I

O

N

S

SPOA7 Capacity 7,000lbs.

SPOA9 Capacity 9,000lbs.

1750 lbs. per arm

2250 lbs. per arm

SPO9 Capacity 9,000lbs.

2250 lbs. per arm

Содержание SPO9

Страница 1: ...t 200 Series Lifts V A L I D A T E D CERTIFIED B Y E T L Entire contents October 2000 by Rotary Lift All rights reserved IN20008 Rev P 10 04 00 I N S T A L L A T I O N I N S T R U C T I O N S SPOA7 Ca...

Страница 2: ...est wall Power Unit Passenger Side Wheel Spotting Dish NOTE Dimension is from Inside of Baseplate to Inside of Baseplate Fig 1a Fig 1b 3 10 1178mm 8 11 5 8 2734mm SPO9 15 381mm 2 5 737mm 6 0 1829mm mi...

Страница 3: ...se shoe shims are used at any of the column anchor bolts pack non shrink grout under the unsupported area of the column base Insure shims are held tightly between the baseplate and floor after torquin...

Страница 4: ...1 HHCS and 3 8 Flanged Locknuts Fig 4 Tighten bolts at center of overhead assembly 9 Power Unit First install 1 star washer onto one of the 4 5 16 18NC x 1 1 2 HHCS This is very important for groundin...

Страница 5: ...cknut 1 4 20NC x 2 HHCS 1 4 Locknut Spacer 1 4 20NC x 3 4 HHCS Star Lockwasher and Nut 111 3 8 7 3 4 SPO9 3 8 16NC x 3 4 HHCS Flanged Locknut 1 4 20NC x 2 HHCS 1 4 Locknut 1 4 20NC x 3 4 HHCS Star Loc...

Страница 6: ...l Vent Screw Fill Breather Cap Raise Switch Lowering Valve PUSH LEVER TO LOWER Branch Tee Power Unit Hose Overhead Hose ALLOW 2 SECONDS BETWEEN MOTOR STARTS FAILURE TO COMPLY MAY CAUSE MOTOR BURNOUT P...

Страница 7: ...elop a pressure tight seal CAUTIONOvertightening will damage fitting resulting in fluid leakage Adapter Hose Installation see Fig 9b 1 Install Pc 2 with hose clamps on power unit column side connectin...

Страница 8: ...left column and feed the end of the cable through the latch cable sheave slot so that the cable is now back outside the column Fig 13 F Route cable under the bottom side of the latch cable sheave Fig...

Страница 9: ...plunger Verify that Power Unit stops working when switch bar is raised and re starts when the bar is released MOTOR OPERATING DATA SINGLE PHASE LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE 208 230 Volts 6...

Страница 10: ...T3 BROWN T4 WHITE T5 RED L E G E N D T6 BLACK T7 WHITE T8 RED T9 BLUE Two different wiring colors were used Determine appropriate LEGEND T1 T2 T3 T4 T5 T6 T7 T9 T8 Fig 16 NOTES 1 Unit not suitable for...

Страница 11: ...sing clearance gap NOTE Once arm is installed in yoke pull up actuator pin and swing arm fully around being sure that the Restraint Gear and Gear Block always stay aligned If they do not stay aligned...

Страница 12: ...ar Block to mesh together Fig 18 17 Oil Filling Bleeding Use Dexron III ATF or Hydraulic Fluid that meets ISO 32 specifications Column Arm Pin Cotter Pin Arm Long Bumper Short Bumper Padded section of...

Страница 13: ...se lift to check equalizer cable tension Below carriage grasp adjacent cables between thumb and forefinger with about 15 lbs effort you should just pull the cables together Adjust at upper tie offs Fi...

Страница 14: ...14 NOTES...

Страница 15: ...15 NOTES...

Страница 16: ...6502 Fax 812 273 6502 E mail userlink rotarylift com Web site www rotarylift com For Canada DOVER CORP CANADA LTD ROTARY LIFT DIVISION 130 Bridgeland Avenue Unit 210 Toronto Ontario M6A 1Z4 Phone 416...

Отзывы: