Purpose

This procedure establishes the minimum requirements for the lockout of energy that could cause injury to personnel by the 

operation of lifts in need of repair or being serviced. All employees shall comply with this procedure.

Responsibility

The responsibility for assuring that this procedure is followed is binding upon all employees and service personnel from 

outside service companies (i.e., Authorized Installers, contactors, etc.). All employees shall be instructed in the safety 

significance of the lockout procedure by the facility owner/manager. Each new or transferred employee along with visiting 

outside service personnel shall be instructed by the owner/manager (or assigned designee) in the purpose and use of the 

lockout procedure.

Preparation

Employees authorized to perform lockout shall ensure that the appropriate energy isolating device (i.e., circuit breaker, 

fuse, disconnect, etc.) is identified for the lift being locked out. Other such devices for other equipment may be located 

in close proximity of the appropriate energy isolating device. If the identity of the device is in question, see the shop 

supervisor for resolution. Assure that proper authorization is received prior to performing the lockout procedure.

Sequence of Lockout Procedure

1)  Notify all affected employees that a lockout is being performed and the reason for it.

2)  Unload the subject lift. Shut it down and assure the disconnect switch is “OFF” if one is provided on the lift.

3)  The authorized lockout person operates the main energy isolation device removing power to the subject lift.

• 

If this is a lockable device, the authorized lockout person places the assigned padlock on the device to 

prevent its unintentional reactivation. An appropriate tag is applied stating the person’s name, at least 3” 

x 6” in size, an easily noticeably color, and states not to operate device or remove tag.

• 

If this device is a non-lockable circuit breaker or fuse, replace with a “dummy” device and tag it 

appropriately as mentioned above.

4)  Attempt to operate lift to assure the lockout is working. Be sure to return any switches to the “OFF” position.

5)  The equipment is now locked out and ready for the required maintenance or service.

Restoring Equipment to Service

1)  Assure the work on the lift is complete and the area is clear of tools, vehicles, and personnel.

2)  At this point, the authorized person can remove the lock (or dummy circuit breaker or fuse) & tag and activate 

the energy isolating device so that the lift may again be placed into operation.

Rules for Using Lockout Procedure

Use the Lockout Procedure whenever the lift is being repaired or serviced, waiting for repair when current operation could 

cause possible injury to personnel, or for any other situation when unintentional operation could injure personnel. No 

attempt shall be made to operate the lift when the energy isolating device is locked out.

LIFT LOCKOUT/TAGOUT PROCEDURE

Lift is not intended for outdoor use and has an operating ambient temperature range of 5º-40ºC.

OPERATING CONDITIONS

Содержание HydroLift MC62

Страница 1: ...O N M A I N T E N A N C E Original Instructions Mobile Column Lift 24V DC Powered 4 Column Lift Capacity 24 800 kg 6 Column Lift Capacity 37 200 kg 6 200 kg per column IN161101N A IMPORTANT Reference...

Страница 2: ...t heavy vehicles for maintenance cleaning or repair to optimum working height Operation is carried out with a mobile control panel Lifting and lowering the vehicle is carried out in jog mode Electroni...

Страница 3: ...Battery Size 24 Frame Group 80 AH Capacity At 20 AH Rate Stud Terminals with Stainless Steel Wing nuts Battery wires are clearly marked labeled inside the unit itself Install tie down straps on batte...

Страница 4: ...e is 10 5mm per meter side to side of vehicle and 21 0mm per meter front to rear of vehicle DO NOT use on a suspended floor structure without specific approval from structural engineer Ensure tires ar...

Страница 5: ...enough to engage locks b Loosen bleed screw to release air from system c Close screw and repeat steps a and b until there is no air in the system and fluid runs clear Bleed Screw Do Not Exceed Torque...

Страница 6: ...d in the safe use and operation of the lift using the manufacturer s operating instructions ALI SM 07 1 ALI Lifting it Right safety manual ALI ST 05 ALI Safety Tips card ANSI ALI ALOIM 2008 American N...

Страница 7: ...interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful inte...

Страница 8: ...was just placed The column will show Green when activated 5 Position next column at second wheel using loading instructions from step 3 6 Turn on second column Again using the Control Panel and the bu...

Страница 9: ...9 Fig 3 Fig 4 Fig 2 Power Up Switch...

Страница 10: ...olumns slowing down and speeding up at various stages of travel This is a normal characteristic of the lift leveling system Monitor the safety locks while raising the lift by listening for the mechani...

Страница 11: ...open Power Unit Cover Pull lock open Pull the Manual Lowering Valve Button and the carriage will begin lowering C If lift is on locks slightly lift carriage until lock is free D Lower each carriage a...

Страница 12: ...ed Red fast flash indicates a column with an error Operating Instruction Details Options Changing the System Configuration Columns may only be added to or removed from a system by unlocking the existi...

Страница 13: ...THE VICINITY OF A LEAD ACID BATTERY IS DANGEROUS BATTERIES CONTAIN SULFURIC ACID AND PRODUCE EXPLOSIVE GASES A BATTERY EXPLOSION COULD RESULT IN LOSS OF EYESIGHT OR SERIOUS BURNS FOR THIS REASON IT IS...

Страница 14: ...rriage for damage Monthly Check Emergency Stop Push the Emergency Stop button Columns should be inoperative with any emergency stop button depressed Monthly Lubrication 1 Lower lift check oil level in...

Страница 15: ...ess the buttons below in exact order until the error is generated 1 Up button Error Check replace contactor 2 Slow lower Error Check replace small lowering valve 3 Lower to locks Error Check replace l...

Страница 16: ...nnect switch is OFF if one is provided on the lift 3 The authorized lockout person operates the main energy isolation device removing power to the subject lift If this is a lockable device the authori...

Страница 17: ...Charger Red Black Black 12V Battery 12V Battery Ground String Pot Radio Wireless 2SWLRQDO Control PCB Buzzer Slow Valve Lock Solenoid Fast Valve Contactors Red White Black Bat Voltage Monitor Black B...

Страница 18: ...18 HYDRAULIC SCHEMATIC...

Страница 19: ...19 NOTES...

Страница 20: ...r for Genuine Rotary Replacement Parts See Literature Package for Parts Breakdown Rotary Lift Consolidated Haimen Co Ltd No 1388 East Xiushan Road Haimen Jiangsu Province China 226100 www vsg asia com...

Отзывы: