Rotadex ShelvingDirect RGWB Скачать руководство пользователя страница 1

Before you begin...

4

Ensure that you have sufficient space to work and allow at 

least 

ONE HOUR

for assembly, particularly if you have never 

built a unit before. We recommend

two-person

assembly.

4

Always use a rubber mallet for assembly and

NEVER

a metal hammer. Please note: 

force is required

! The

components are designed to fit tightly together so that they 

don’t wobble or break apart, so a light tap will

NOT

locate the 

parts sufficiently. 

4

We recommend wearing gloves when assembling.

Thank you for purchasing your 

ShelvingDirect® shelving 

If you have any questions regarding the 

assembly or contents of your order, please call 

ShelvingDirect® on

0121 508 5877

Monday to Friday 8.30am–5.30pm or email

[email protected]

ShelvingDirect® is a trading name of Rotadex

Systems Ltd, Systems House, Central Business Park, 

Mackadown Lane, Birmingham B33 0JL.

Assembly instructions

STEP 1:

Arrange the four uprights 

[A]

so that the

“keyholes” have the larger aperture uppermost:

STEP 2:

Begin by attaching the heavy duty plastic feet 

[B]

to the

base of the upright posts.

STEP 3:

With one person holding two uprights parallel, join them

by adding a side beam 

[C]

near the top (at the desired level for the

uppermost shelf) by striking its lugs firmly down into the “keyholes”

of the uprights using a rubber mallet. Force is required. 

NOTE:

the lugs do not need to go completely to the bottom of the

keyholes.

Pinch the side beam and upright together using thumb

and forefinger directly between the lugs to ensure they are located

before hammering.

STEP 4:

Add a second side beam 

[C]

near the bottom and at the

desired level for the lower shelf level.

STEP 5:

Add the remaining two side beams 

[C]

, spacing them as

you require. Using this first sub-assembly as a ‘spacing guide’,

repeat this process with the other two uprights to create another

“ladder”. These form the left and right sides of your shelving unit.

STEP 6:

Take a cross beam

[D]

and join the two “ladders” together

by attaching it near the top, at the same height as the uppermost

side beams. Repeat at the bottom.

STEP 7:

Add cross beams 

[D]

to the back of the unit too, and fit all

remaining cross beams ensuring they are located at the same height

as their corresponding side beams 

[C].

STEP 8:

If you have purchased an wide unit, tap in the

centre support beams 

[E]

. You may need to push the cross beams

[D]

towards one-another to do this.

STEP 9:

Lastly, add the shelf levels 

[F]

. You will find it easier to

swivel the shelves in at an angle. The shelves are slightly smaller

than the space they fill, to aid assembly.

[C]

[D]

[E]

[F]

GALV WOR LOUVRE PANEL

GALV WOR LOUVRE PANEL

BEFORE YOU BEGIN!

n

 

Ensure that you have sufficient 

space to work and allow at least 

ONE HOUR for assembly, particularly 

if you have never built a unit before.

n

 

We recommend two-person 

assembly.

n

 

Always use a rubber mallet for 

assembly and NEVER a metal 

hammer. Please note: force is 

required! The components are 

designed to fit tightly together so 

that they don’t wobble or break 

apart, so a light tap will NOT locate 

the parts sufficiently. 

n

 

We recommend wearing gloves 

when assembling.

PAGE 1 of 2

PLEASE CHECK YOUR COMPONENTS

Half Shelf Width Beam 

2400mm.

Qty 4

Top Shelf Depth 

Beam 600mm. 

Qty 2

Heavy Duty Rear 

Upright 1437mm. Qty 2

Half Shelf Depth 

Beam 600mm. 

Qty 4

Top Shelf Width 

Beam 2400mm.

Qty 2

Heavy Duty Shelf 

Support 600mm. 

Qty 2

Heavy Duty Shelf Support 

310mm. 

Qty 4

Upper Shelf 2390mm 

wide x 590mm deep.

Qty 1

Lower Shelf 2390mm 

wide x 304mm deep. 

Qty 2

Louvre Panel.

Qty 1

Plastic Feet.

Qty 4

4.8X13 size 

self-tapping 

screws. Qty 16

Width Louvre Beam. 

Qty 1

M6 size bolts 

with serrated 

nuts. Qty 28

Upright Louvre. 

Beam. Qty 1

Beams

Shelf Supports

Upright Posts

Shelves

Louvre Panel

Fixings and Feet

Accessories

Assembly Gloves and 

Rubber Mallet.

Spanner for self-tapping screws.

Heavy Duty Front 

Upright 929mm.

Qty 2

A

B

C

D

E

F

G

H

I  

J  

K  

A

B

B

C

E

E

E

E

D

D

F

F

G

H

I  

J  

K  

These are the component parts required to assemble your galvanised 
workbench with louvre panel. Please take time to indentify each part 
before you begin assembly! NOTE: You will also need a screwdriver and a 
spanner or socket wrench suitable for an M6 nut.

WE RECOMMEND

2 PERSON

ASSEMBLY

NOTE: You will also need 

a screwdriver and a 

spanner or socket wrench 

suitable for an M6 nut.

RGWB

Отзывы: