Synergy Series Installation Guide (v18)
Preliminary Cabling and Check • 3–3
Control Cable Installation
Use the following procedure to install the control cable between the Frame and the Control Panel:
Frame to Control Panel Interconnection
1. Ensure that you have the correct
8-pin
shielded Telco cable, with
8-pin
connectors at
each end. Because of their small size, all Telco connectors look quite similar.
2. Using an 8-pin shielded Telco cable, connect the communications port labeled
PANEL
(on the electronics frame) to the communications port labeled
FRAME
(on the rear of
the control panel).
This completes the procedure to install the control cable between the Frame and the Control Panel.
Please note:
•
The maximum cable length is 1000 feet (305 meters).
•
The cable must be run in accordance with good engineering practice. Ensure that there is
sufficient room for the cable and that enough slack is left in the cable run to permit long,
gentle bends. Always install cables so that they will not be subjected to physical abuse.
Remote Aux Panel Cabling
This section provides instructions for cabling both
old
and
new version
Remote Aux Panels
. The
following topics are discussed:
•
Remote Aux Panel Cabling — Old Version Panels
•
Remote Aux Panel Cabling — New Version Panels
•
Aux Panel Cabling Notes (applies to
all panel versions
)
Depending upon the type of Remote Aux Panel that you have installed, please refer to the appropriate
“cabling” section below.
Important
The cable connecting the Synergy Control Panel to the Synergy Frame
is not wired as a standard CAT5 ethernet cable. If you need a cable of a
specific length, contact your Ross Video Representative for ordering
information.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
53
54
55
56
61
62
63
64
PV
EXP
4
EXP
2
AUX
11
OVL
SPARE
EXP
3
EXP
1
AUX
12
PV
CLEAN
PGM
AUX
6
AUX
4
AUX
8
AUX
10
AUX
5
AUX
3
AUX
2
AUX
1
AUX
7
AUX
9
57
58
59
60
45
46
47
48
49
50
51
52
DVE 1
DVE 2
PERIPHERAL 1
PERIPHERAL 2
EDITOR
GPI
PANEL
NOTE:
REFERENCE CAN
COME FROM ANY
INPUT
ROSS VIDEO LTD.
MODEL
ISSUE
SERIAL#
RATING:
85 - 250 V
47 - 63 Hz
600 WATTS
CAUTION:
DISCONNECT POWER
BEFORE SERVICING
ATTENTION:
COUPER LE COURANT
AVANT L'ENTRETIEN
RATING:
85 - 250 V
47 - 63 Hz
600 WATTS
INPUTS
AC POWER
PRIMARY
REDUNDANT
OUTPUTS
OUTPUTS
PV
PV
PV
PGM
MAIN
MLE 4
MLE 3
MLE 2
MLE 1
PGM
PGM
PGM
DIGITAL PRODUCTION SWITCHER
SERIES
!
Synergy Rack Frame
8
1
2
3
4
7
6
5
4
3
2
1
REMOTE
TALLY
2
1
FRAME
AUX
Synergy Control Panel
Содержание Synergy 2 SD
Страница 1: ...Ross Video Limited Installation Guide Volume I Software Issue 18...
Страница 10: ......
Страница 18: ...viii Contents Synergy Series Installation Guide v18...
Страница 88: ...2 44 Installation Synergy Series Installation Guide v18...
Страница 122: ...4 18 Preliminary Video Installation Synergy Series Installation Guide v18...
Страница 132: ...5 10 Using the Menu System Synergy Series Installation Guide v18...
Страница 156: ...6 24 BNC Configuration and Check Synergy Series Installation Guide v18...
Страница 292: ...9 62 Additional Installation Setups Synergy Series Installation Guide v18...
Страница 326: ...11 10 Still Stores Synergy Series Installation Guide v18...
Страница 346: ...12 20 Editors OverDrive Synergy Series Installation Guide v18...
Страница 394: ...GL 4 Glossary of Terms Synergy Series Installation Guide v18...