
Synergy 100 Installation Guide (v16.10-S100)
Installation • 2–7
Frame, Front View
The following figure illustrates the front of the frame, with the door removed.
Synergy 1 SD Frame, Front View
Following are descriptions of each front component.
1.
Frame CPU Board
The
Frame CPU Board
provides all the electronics required for the Synergy 1 SD
Switcher. The board also houses several “daughter” boards for options such as
Squeeze
& Tease 2D
or
WARP
,
Ultimatte Insider
, or
Floating Border Generator
.
2.
Power Supply Lock Down Plate
The power supply is held in place with a single lock-down plate that is secured with two
screws. These screws must be loosened and the lock-down plate moved up in order to be
able to remote the power supply.
3.
Power Supply Handle
A small handle is provided to assist in removing and inserting the power supply. The
tray houses the power supply and frame fan. For chassis cooling, note that air flows in
from the sides of the frame, across the circuit boards and out the rear exhaust port.
4.
Fan Fail LED
The
FAN FAIL
LED, when lit, indicates that the fan is drawing too much current or has
stopped turning.
5.
Power Fail LED
The
POWER FAIL
LED, when lit, indicates that the power supply has failed or is not
connected properly.
1) Frame CPU Board
2) Power Supply Lock Down Plate
3) Power Supply Handle
4) Fan Fail LED
5) Power Fail LED
6) Power On LED
7) Power Switch
8) Fuse
Warning
Hazardous
Voltage
When the power supply is inserted into the frame, it mates with male
power pins that carry
live voltage
if the frame is plugged in. All power
must
be disconnected before servicing. Caution — do
not
insert your
fingers into the power supply slot when the unit is plugged in!
FUSE
T4A/250V
POWER
FAN
FAIL
PWR
FAIL
PWR
ON
1
4
5
6
7
8
2
3
TO REDUCE THE RISK OF
FIRE REPLACE WITH SAME
FUSE AND RATING
CAUTION:
Содержание Synergy 100
Страница 1: ...Ross Video Limited Installation Guide Software Issue 16 10 S100...
Страница 10: ......
Страница 16: ...vi Contents Synergy 100 Installation Guide v16 10 S100...
Страница 66: ...2 32 Installation Synergy 100 Installation Guide v16 10 S100...
Страница 88: ...5 6 Using the Menu System Synergy 100 Installation Guide v16 10 S100...
Страница 100: ...6 12 BNC Configuration and Check Synergy 100 Installation Guide v16 10 S100...
Страница 134: ...7 34 Communication Setup Synergy 100 Installation Guide v16 10 S100...
Страница 170: ...8 36 Additional Installation Setups Synergy 100 Installation Guide v16 10 S100...
Страница 186: ...9 16 Completing Setup Synergy 100 Installation Guide v16 10 S100...
Страница 208: ...10 22 Appendix A Specifications Synergy 100 Installation Guide v16 10 S100...
Страница 216: ...11 8 Appendix B Hardware Options Synergy 100 Installation Guide v16 10 S100...
Страница 234: ...GL 4 Glossary of Terms Synergy 100 Installation Guide v16 10 S100...
Страница 246: ...IX 12 Index Synergy 100 Installation Guide v16 10 S100...