Zero and Span Target Orientation
Mount the transmitter with sufficient clearance so the zero and span targets
are accessible.
Mount the Transmitter
Panel Mount
Electrical Connection
1. Pull the leads through the threaded mounting hole in the panel wall.
2. Hand tighten the electrical connection into the mounting hole.
3. Using a wrench on the hex flat at the process connection, apply sufficient
torque to prevent transmitter vibration. Do not exceed 100 ft-lbs.
Process Connection
1. Hand tighten the appropriate sized impulse piping into the process
connection.
2. Using a wrench on the hex flat at the impulse piping connection, apply
enough torque to prevent the process fluid from leaking. Do not exceed
100 ft-lbs.
NOTE
Apply torque only to the hex flat located at the process end of the transmitter.
Do not apply torque to the transmitter body or electrical connection - severe
damage could result. Do not exceed 100 ft-lbs.
NOTE
Integral conduit seal meets the requirements of NEC
©
2002 section 501:5 (A)
and 501.5 (B). No additional conduit seal is required.
NOTE
The Model 4600 features a reliable dual process seal design which meets the
requirements of NEC
©
2002 section 501:5 (F)(3) and API 14F 6.8.2.2. No
additional process sealing is required.
See “Safety Messages” on page 2-1 for complete warning information.
Содержание 4600
Страница 2: ......
Страница 4: ......
Страница 8: ...Reference Manual 00809 0100 4022 Rev AA July 2002 Model 4600 TOC 4 ...
Страница 20: ...Reference Manual 00809 0100 4022 Rev AA July 2002 Model 4600 2 10 ...
Страница 54: ...Reference Manual 00809 0100 4022 Rev AA July 2002 Model 4600 4 12 ...
Страница 64: ...Reference Manual 00809 0100 4022 Rev AA July 2002 Model 4600 B 2 ...
Страница 67: ......