1-6
1.4 QUICK START-UP
The following quick start-up procedures explain how to
put the analyzer and attached sensor(s) into immediate
operation.
NOTE
These procedures are only applicable to
the
very first
power up.
1.
Install sensor(s) as described in their instruction
manual, and wire to analyzer as shown in Section 1.3.
2.
A summary of factory settings for pH/ORP sensors,
and conductivity sensors, based on cell constant
(K) is contained in
. If these values are not
acceptable, refer to
procedures to change.
complete summary of factory settings.
MODEL 2700
SECTION 1.0
INSTALLATION AND QUICK START-UP
FIGURE 1-6. Junction Box and Multiple Sensor Wiring.
DWG. NO.
REV.
40270008
D
MILLIMETER
INCH
Содержание 2700