Maintenance and Service
Axles
407 / 564
7.6
Axles
7.6.1
Planetary gearing (applies to all 3 axles)
The first oil change is required after 50 operating hours, further oil changes must be
performed annually.
ATTENTION
For 6-row machines with 45 cm or 50 cm clearance:
The "lifting only" distance (without idling and turning) for 1000 ha at 6x45 cm row dis-
tance is 3700 km! The total distance is approx. 5000 km.
Above a harvesting area of 1000 ha/year we recommend changing the oil in the plane-
tary gears after half of the harvesting season!
Please use high-quality oil. Use the best quality oil rather than oil that just meets the
quality requirements. Economising here is saving at the wrong place.
Park the machine so that the respective wheel is sitting as shown in the illustration.
1
2
(1)
Oil filling opening and oil level control screw
(2)
Oil drain screw
DANGER
Injury hazard!
Hazard to life due to moving machine parts.
– Before oil change, each time stop the machine and switch off the engine.
– The machine must be secured against inadvertent starting of the engine.
– All maintenance and repair work may only be performed by trained personnel.
WARNING
Hazard of hot oil emitting under pressure!
The oil of the planetary gears may become very hot and, due to heating up, may be
under some pressure.
Содержание Tiger 6
Страница 3: ...Contents 3 564 Contents...
Страница 4: ...Contents 4 564...
Страница 13: ...Preface 13 564 1 Preface...
Страница 14: ...Preface 14 564...
Страница 22: ...Safety 22 564...
Страница 23: ...Safety 23 564 2 Safety...
Страница 24: ...Safety 24 564...
Страница 41: ...General View and Specifications 41 564 3 General View and Specifications...
Страница 42: ...General View and Specifications 42 564...
Страница 53: ...General Description 53 564 4 General Description...
Страница 54: ...General Description 54 564...
Страница 57: ...Operating Components 57 564 5 Operating Components...
Страница 58: ...Operating Components 58 564...
Страница 63: ...Operating Components Driver s cabin overview 63 564 13 14 15 13 First aid box 14 Blow gun 15 USB interface...
Страница 98: ...Operation 98 564...
Страница 99: ...Operation 99 564 6 Operation...
Страница 100: ...Operation 100 564...
Страница 226: ...Operation Defoliator 226 564 RIS defoliator RES defoliator...
Страница 256: ...Operation Lifter 256 564 6 14 4 Setting rollers movement height High rollers movement High rollers movement...
Страница 291: ...Operation Infeed conveyor 291 564 2 1 1 Infeed conveyor control block...
Страница 299: ...Operation Strainer wheels turbines 299 564 4 Rpm strainer wheels...
Страница 325: ...Operation Bunker unloading 325 564 6 19 Bunker unloading...
Страница 327: ...Operation Bunker unloading 327 564 45 51 50 47 46 52 53 54 48 55 49 56 Key overview See Page 88...
Страница 361: ...Maintenance and Service 361 564 7 Maintenance and Service...
Страница 362: ...Maintenance and Service 362 564...
Страница 418: ...Maintenance and Service Defoliator 418 564 Defoliator in the maintenance position...
Страница 475: ...Malfunction and Remedies 475 564 8 Malfunction and Remedies...
Страница 476: ...Malfunction and Remedies 476 564...
Страница 527: ...Lists Tables Plans Diagrams Maintenance Verification 527 564 9 Lists Tables Plans Diagrams Maintenance Verification...
Страница 528: ...Lists Tables Plans Diagrams Maintenance Verification 528 564...
Страница 558: ...558 564...
Страница 559: ...Index 559 564 10 Index...
Страница 560: ...Index 560 564...